background image

64

6.1.2. Electric supply

The machine is supplied ready for connection
according to the required electrical specifications.

Before connecting the machine ensure that the plate
details (

fig. 1) comply with those of the electric

distribution network.

The electrical connection cable must be directly
connected to the connection provided according to
current legislation. Ensure that the earthing system
is efficient and in compliance with current legal
requirements.

The earthing system and the lightening protection
system must be realized in accordance with the
provisions of current legislation.

For the supply network use a cable in compliance with
standards with protective conductor (earthing wire).

For three-phase power use a cable with 5 conductors
( 3 n earth).

For single phase power supply use a cable with 3
conductors (phase + n earth).

In both cases it is necessary to provide an automatic
differential switch (

Fig. 6) at the start of the power

cable, complete with magnetic release elements in
accordance with the identification plate details (

Fig.

1). The contacts must have an opening of equal or
over 3 mm and with dispersed current protection of
30 mA.
Remember that each machine must be fitted with its
own safety elements.

WARNING:

Should the power supply cable be damaged
it is to be replaced by the manufacturer or by
its technical assistance service or by person
with equivalent qualification, in order to pre-
vent any risks.

6.3. Connections

Place the machine on the horizontal surface

previously prepared.

Before connecting, thoroughly wash the mains water
pipes:

Leave the water supply taps running at full pressure

for several minutes.

Connect to the mains water supply.

Connect the machine to the socket.

Thoroughly wash all the water pipes of the machine:

Leave the water supply taps running at full

pressure.

Switch on main switch 1: wait until the boiler fills

up to the level set.

Switch on main switch 2 to begin heating the water

in the boiler.

Operate each unit in order to allow the water to

escape for about one minute; repeat the operation
twice.

Deliver steam from the steam jets for about one

minute.

Deliver hot water for about one minute; repeat the

operation twice.

Switch off switches 1 and 2.

Empty the water from the boiler: see point 10.3

IMPORTANT

Should the machine not deliver water for over
24 hours, wash the internal components be-
fore beginning work, repeating the operations
as described above

ATTENTION

Please be informed that in order to avoid
pressure falls during the boiler filling we fitted
into the filling solenoid valve a restription Ø
1.25 mm.
If, during the installation, the machino get in
security mode (the on/off selection on the
touch pad will flash) reset the machine using

the main switch.

6.2. Preliminary operations

ANTISUCTION VALVE INSTALLATION

NOTE TO THE INSTALLER
On the top of the boiler there is the antisuction valve.

When installing the machine make sure to remove
the plastic fork “A” and check that the pin ”B” is
not blocked.

This operation is very important for the correct working
of the machine.

Fig. 7

Содержание Epoca S

Страница 1: ...epoca USE AND MAINTENANCE S CD DE version 2 0...

Страница 2: ...asures 7 5 Transport 8 5 1 Packaging 8 5 2 Inspection Upon Receipt 8 6 Installation 8 6 1 Connections Made By User 8 6 1 1 Water Supply 8 6 1 2 Electric Supply 9 6 2 Preliminary Operations 9 6 3 Conne...

Страница 3: ...Fig 1 Fig 2 1 Manufacturer 2 Model and version 3 Voltage 4 EC conformity mark if required 5 Serial number 6 Boiler data 7 Wattage 8 Protection level 9 Motor power 10 Heating element power 11 Frequency...

Страница 4: ...hree items of the same kind Do not place heavy items on the packaging In an emergency such as the machine catching on fire unusual noises coming from the machine overheating etc IMMEDIATELY disconnect...

Страница 5: ...2 1 Specifications and composition Fig 3 4...

Страница 6: ...ee dispensing units groups D Number of steam spouts E Number of hot water spouts Cup warmer available upon request 1 Steam knob 2 Steam spout 3 Hot water knob 4 Hot water spout 5 Coffee dispensing uni...

Страница 7: ...on valve in the hydraulic system and valve on to boiler to avoid overpressure Anti siphon valve on the hydraulic system to avoid backflow to the main supply 2 4 Power safety devices The safety devices...

Страница 8: ...amage and or pollute it The manufacturer cannot be held responsible for damage to people or things caused by unsuitable incorrect or irrational use Fig 5 You will find all the technical data for power...

Страница 9: ...ons must be installed close to the machine Water drainage pipe 1 having a minimun internal diameter of 2 equipped with a water trap accessible for inspection Water supply pipe 2 with a 3 8 G cut off t...

Страница 10: ...n anti siphon valve When installing the machine make sure to remove the plastic fork Fig 8 A and check that the pin Fig 8 B is not blocked This operation is VERY important to ensure the proper perform...

Страница 11: ...7 OPERATION 7 1 Controls Fig 8 Fig 8 10...

Страница 12: ...d to the element for heating the boiler water 3 4 Coffee dispensing switch mod CD Press and release the button LED on coffee is continuously dispensed Press and release the button again and coffee sto...

Страница 13: ...he steam that disperses into the liquid heats it to the desired temperature Turn off the steam knob when the desired temperature has been reached Immediately after carrying out this operation clean th...

Страница 14: ...use the filter holder with the appropriate dose filter and freshly ground coffee Then carry out point 6 and repeat point 7 to check all changed doses If all units are to be programmed with the same d...

Страница 15: ...Operation to be carried out with machine under pressure Discharge the water from the boiler about 4 litres with hot water delivery switch 6 Wait until the machine has re heated before use 10 3 1 Reple...

Страница 16: ...er 12 PROBLEMS AND REMEDIES Check operations to be carried out by the user with the plug disconnected For any type of problem or inconvenience not specifically indicated disconnect the plug and contac...

Страница 17: ...epoca PARTS BREAKDOWN CD DE version 1 01...

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...epoca DIAGRAMS S CD DE version 1 01...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ......

Страница 37: ......

Страница 38: ......

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ......

Страница 43: ......

Страница 44: ...E1 S1 S1 TANK Macchina per caff Machine caf Kaffeemaschinen Coffee machine M quina para caf Uso e manutenzione Emploi et entretien Gebrauch und Instandhaltung Use and maintenance Uso y manutenci n...

Страница 45: ...suchungen und Tests um Ihnen in Bezug auf Funktionalit t Sicherheit Leitungsf higkeit sowie Design ein Produkt anbieten zu k nnen das das Beste auf Markt befindliche ist Das B chlein mit den Anwiesung...

Страница 46: ...2 2 EN 60335 1 EN 60335 2 15 EN 55014 EN 61000 3 EN 61000 4 ENV 50141 EN 55104 Norme EN armonizzate Normes EN harmonis es Harmonisierte EN Norme Harmonized EN norms Normas EN armonizadas VSR S M ed 78...

Страница 47: ...nnections 64 7 Operation 65 7 1 Controls 65 7 2 Control instruments 66 7 3 Starting up 66 8 Use 67 8 1 Preparing coffee 67 8 2 Preparing cappuccino 68 8 3 Warming a beverage 68 8 4 Preparing tea camom...

Страница 48: ...ents or damage to the machine This manual is an integral and essential part of the product and must be delivered to the user The warnings contained in it must be read carefully as they supply importan...

Страница 49: ...e kind Do not place heavy items on the packaging In an emergency such as the breaking out of a fire unusual noise overheating etc take imme diate action disconnecting the power and closing gas and wat...

Страница 50: ...59 2 1 Specifications and composition mod S1 mod E1 Fig 3 Fig 2 1 2 3 4 5 6 7 9 10 8 1 2 3 4 5 6 7 9 10 8...

Страница 51: ...water spouts 1 Steam tap 2 Steam spout 3 Hot water tap 4 Hot water spout 5 Coffee dispensing unit 6 Coffee dispensing button 7 Boiler water level indicator 8 Gauge 9 Power on off switch and led 10 Swi...

Страница 52: ...pump motor safe resistance thermal 2 5 Aerial noise Noise level in the working place does not usually exceed 70dB A 2 6 Vibrations The machine is supplied with rubber vibration damping feet In normal...

Страница 53: ...or dispersal grilles with cloth or any other thing do not use the machine when wet or very damp 4 USE The machine have been designed manufactured and protected to be used to make express coffee and ho...

Страница 54: ...electric components Reserve an area near the machine for the installation of the coffee grinding and dosage machine see relevant documentation The machine is usually equipped with a water softener typ...

Страница 55: ...vent any risks 6 3 Connections Place the machine on the horizontal surface previously prepared Before connecting thoroughly wash the mains water pipes Leave the water supply taps running at full press...

Страница 56: ...65 7 OPERATION 7 1 Controls Fig 8 Fig 8 A B C D E 4 mod E1 S1 mod S1 TANK mod S1 TANK 1 2 2 3 5 6 7 8 8 9 1...

Страница 57: ...ANK On pressing the button continuous coffee dispensing begins and the led comes on On re pressing the switch the coffee delivery stops and the led goes out 4 Electronic coffee delivery button panel m...

Страница 58: ...rim of the filter while pressing If ground coffee is left on the rim of the filter a leaktight seal is not ensured with consequent leaking of water and coffee grounds Lock the filter holder into the...

Страница 59: ...ired tempera ture has been reached Immediately after carrying out this operation clean the spout with a sponge or clean cloth Be careful as the spout is hot and may burn your hand 8 2 Preparing cappuc...

Страница 60: ...oint 6 and repeat point 7 to check all changed doses If all units are to be programmed with the same doses the selection of coffee doses is finished If the dosage of another unit is to be changed 1 2...

Страница 61: ...d blind filter in the filter holder put in a spoonful of detergent in powder for coffee machines and fit the filter holder in the unit to be cleaned Press the coffee dispensing button and draw water f...

Страница 62: ...1000 coffees day DP4 nr 1 regeneration per month for 1000 coffees day nr 2 regenerations per month once a fortnight for 2000 coffees day This table has been drawn up according to a water hardness of 2...

Страница 63: ...rs A The machine does not start check that the plug is connected In case of power failure wait for the power to return and check if the earth leakage protection circuit breaker or the main switch is o...

Страница 64: ...Water lack indicator Indicador por falta agua MO Morsettiera Bornes Klemme Clamp Borne MP Motore pompa Moteur pompe Pumpen motor Motor Pump Motor bomba MT Morsetto di terra Borne du sol Erdklammer Ea...

Страница 65: ...91 REV 00 J5 J6 J4 GR...

Страница 66: ...92...

Страница 67: ...93...

Страница 68: ...RD TARJETA ELECTR NICA E 1 R23 Regolazione pressione Pressure setting R glage pression Duck einstellung Regulaci n presi n W8 Abilitazione programmazione dosi Dose setting mode Habilitation r glage de...

Страница 69: ...e volumetric pump bomba volum trica RA rubinetto acqua robinet eau Wasserhahn water tap grifo de agua RL rubinetto carico robinet d arriv e Auff llhahn inlet water tap grifo de carga RV rubinetto vapo...

Страница 70: ...96 EPOCA E1...

Страница 71: ...97 PV EPOCA S1...

Страница 72: ...98 EPOCA S1 TANK...

Отзывы: