RADWIN 5000 SCB Jet User Manual
Release 4.2
4-6
Step 2: Mount the HBS/HSU
Hardware Installation
2. Check that everything listed on the included Bill of Materials or Pro-forma Invoice is
present.
3. If any item is missing, contact Customer Service.
4. Do not dispose of the packaging until the unit is installed and operational.
4.5.2 Step 2: Mount the HBS/HSU
Use a mounting kit to mount the HBS/HSU on a pole as shown in the following figures:
Figure 4-6: Mounting Kit Contents
10.Connect the pole clamp to the radio holder with the 8x80 bolts, but do not tighten
the bolts all the way - tighten them so that they are not closer than a distance
equal to the radius of the pole. You will then have one “unit” that you can take to
the location on the pole where you want to mount the ODU. (See
Figure 4-15
to
Tighten all bolts with a torque of 15Nm.