RADWIN 5000 SCB Jet User Manual
Release 4.2
1-1
Chapter 1: About this User
Manual
1.1 Manual Structure
This User Manual is divided into seven functionally distinct sections reflecting the activities
required to set up a RADWIN 5000 SCB Jet sector. The division is shown in the following
table:
1.1.1 Notifications
Notifications consist of Warnings, Cautions and Notes.
Table 1-1: User Manual - General layout
Section
General Content
Purpose
1
Installation
Site preparation and hardware Installation. Smart
Antenna Alignment
2
PtP Link
Configuration and
Management
Using the RADWIN Manager to bring up a link. Fine tuning
the link, monitoring and diagnostics.
3
PtMP Sector
Configuration and
Management
Using the RADWIN Manager to bring up a sector. Fine
tuning for the base station and the subscriber units. Using
Smart Bandwidth Management, monitoring and
diagnostics.
4
Site Synchronization
Intra-site with Hub Site Synchronization, GSU
5
Advanced
Installation
VLAN, QoS, Radar Mitigation and Dynamic Frequency
Selection (Radar avoidance)
6
Management Tools
Software upgrade, Backup and Restore and Spectrum
View
7
Appendixes
RF Exposure, Models, Laboratory installation and
preparing a PtMP HBS for PtMP