How to Prepare for SCOPIA Elite 5200 Series MCU Installation | 6
RADVISION | Installation Guide for SCOPIA Elite 5200 Series MCU Version 7.5
Step 3
Cut the plastic straps.
Note:
The plastic straps are tightly stretched and can hit you when you cut them. To avoid this,
make sure you do not face the side of the box secured by the straps before you cut the
straps.
Step 4
Cut the strapping tape.
Step 5
Open the shipping box.
Step 6
Take the accessories kit out of the shipping box.
Step 7
Take the MCU unit out of the shipping box.
Step 8
Carefully open the additional boxes, remove the packing material, and remove the drives and
other contents.
Note:
We recommend that you keep the packaging materials in case you need to repack the
unit.
Verifying the Contents
After opening the shipping box, you need to verify the shipment is complete.
Compare the contents of the shipment with your packing list.
Inspecting for Damage
After you verify that all of the equipment is included, carefully examine the CDEs, cards, power
supplies, and cables for any damage resulting from shipping. If you suspect any damage from
shipping, contact your local freight carrier for procedures on damage claims. If you observe any
physical defects in the items you ordered, contact RADVISION Technical Support for Return
Material Authorization (RMA) form.
Note:
Before proceeding with the installation, verify that all of the ordered parts are present and in good
condition. Keep a record of the parts and serial numbers. If any parts are missing or damaged,
contact your sales representative.