2
How to Prepare for SCOPIA Elite 5200 Series MCU Installation | 4
RADVISION | Installation Guide for SCOPIA Elite 5200 Series MCU Version 7.5
How to Prepare for SCOPIA Elite 5200 Series MCU
Installation
Perform procedures in this section to prepare the site and the SCOPIA Elite 5200 Series MCU
chassis for installation.
•
•
Unpacking the SCOPIA Elite 5200 Series..................................................... page 5
•
•
About Site Preparation
Prior to installing the SCOPIA Elite 5200 Series MCU, you need to verify that your site is suitable
for the MCU. Read this section to learn about the product technical specifications and site
requirements. Ensure to make necessary changes in case you find that the site does not meet any
of the requirements described in this section.
Power system:
•
Input: 90-264VAC, 50/60Hz
•
Power supply: single 400W AC supply
•
Consumption:
–
Media Blade: Max 250W (50°C)
–
Chassis: Max. 85W (50C)
–
Fully populated: DC 585W (50°C), AC 700VA (50°C)
•
Redundancy:
–
Redundant AC feed
–
Redundant hot swap AC supplies (Optional)
•
Max. power consumption: DC 335W (50°C) AC 392VA (50°C)
•
Heat dissipation: 1997 BTU/Hr (50°C)
Mechanical characteristics: