
INSTRUCTIONS FOR THE FIRST TIME IN SERVICE
RK 100 - RAD - ING - MAN.INST - 1311.1 - DIGITECH CS MIAH4
35
4.4 Filling the condensate trap
The condensation trap must be pre-
filled when starting the boiler for the
first time in order to prevent flue
gases from flowing back through the
trap.
The filling operation is carried out as
follows (fig. 1 previous page):
Remove
plug
T
and fill the trap
S
three quarters full with water.
Replace
plug
T
and connect the
drainpipe
P.
Note: It is advisable, after the first
few months of operation, to clean the
condensate trap from deposits
resulting from the first passage of
condensate within the technical
components of the boiler. Such
deposits may cause the malfunction
of the siphon.
Fig. 1
S
B
T
T
B
S
Содержание RK 100
Страница 2: ......
Страница 71: ...MAINTENANCE INSTRUCTIONS RK 100 RAD ING MAN INST 1311 1 DIGITECH CS MIAH4 67...