Chapter 1: Basic Operations
Turning On and Shutting Down the System
Quantum DXi6900 G2 Field Service Manual
22
Turning On the DXi6900 G2
To turn on the system, power on the DXi6900 G2 system components in the following order:
1. Turn on both power switches on the back of each Expansion module (EBOD). Wait until the seven
segment display on the rear of the module displays
00
(approximately 1 minute).
2. Turn on both power switches on the back of each Array module (RBOD). Wait until the seven segment
display on the rear of the module displays
99
(approximately 5 minutes).
3. Press the power button on the front of the Node. Wait for the system to boot before attempting to log on.
Note:
The system can take approximately 30 minutes to start up, depending on the amount of
installed storage capacity.
The system is now ready for operation.
Powering on the DXi6900 G2 Expansion Modules (EBODs)
ID/Diag
Port 1
ID/Diag
Port 1
1
2
2
1. Seven Segment Display
2. Power Switches
Powering on the DXi6900 G2 Array Modules (RBODs)
Port 1
Port 2
ID/
Diag
|O|O|
Port 1
Port 2
ID/
Diag
|O|O|
1
2
2
1. Seven Segment Display
2. Power Switches
Powering on the DXi6900 G2 Node
1