22
Operating Procedures
2
This section contains procedures for executing the following
operator tasks:
•
Applying and removing power
•
Placing the library on-line or taking it off-line
•
Inserting and removing tape cartridges using the load port
•
Manually unloading a tape cartridge from a DLT tape drive
Applying Power to
the Library
2
To apply power to the library:
1 Verify the following:
a
Front door and load port closed
b
All outer skins attached
c
All rear panel connections secured
2 At the rear panel, set the AC power switch to the | (on)
position.
3 After several seconds, verify that SDA shows
System
On-line
.
Note: System On-line
is only displayed if the library power-up state is
configured for
On-line
. Otherwise,
System Off-line
is displayed in
the SDA. (See Chapter 3, “Operator Troubleshooting,”)
Placing the Library
On-Line
2
To place the library on-line:
1 With the library power applied and the SDA showing
System
Off-line
, press the control panel
STANDBY
button.
2 Verify that
System On-line
is displayed in the SDA.
Taking the Library
Off-Line
2
To take the library off-line:
1 With the library power applied and the SDA showing
System
On-line
, press the control panel
STANDBY
button.
2 Verify that
System Off-line
is displayed in the SDA.
Содержание ACL 4/52
Страница 1: ...ACL 4 52 Automated Tape Library for DLT Cartridges Operator s Guide 6211222 05 Ver 5 Rel 0...
Страница 6: ......
Страница 10: ...x ACL 4 52 Operator s Guide...
Страница 12: ...xii ACL 4 52 Operator s Guide...
Страница 36: ...Chapter 1 Library Overview Operator Tasks using the Menu Mode 20 ACL 4 52 Operator s Guide...
Страница 58: ...Chapter 2 Operating Procedures Operating Procedures Using the Menu Mode 42 ACL 4 52 Operator s Guide...