4.6
Overview of Installation
+
The following diagram is a complete Q.HOME BAT-G1 system installation with three
battery modules.
2) Charging Cable
3) CAN Communication Cable
4) Power Cable between BMS and Battery Module (4
.
72in)
5) RS485 Cable between BMS and Battery Module (4
.
72in)
6) Power Cable between Battery Modules (15.75in)
7) RS485 Cable between Battery Modules (15.75in)
8) Series-Connected Plug
4. Installation
4. Installation
28
29
+
The following diagram is a complete Q.HOME BAT-G1 system installation with
terminal boxes and conduit:
Installers are responsible for preparing conduit according to AHJ requirements.
Conduit size shall be 0.5in
for the smaller hole and 1-1.25in
for the larger hole.
Conduit length between the battery modules should be 7.87-9.45in.
NOTE!
DANGER!
+
One Q.HOME BAT-G1 system can contain at most
three
battery
modules. Connecting more than three battery modules will blow the
fuse and the battery module(s) will be damaged. Ensure the number of
battery module(s) meets this requirement.
1
8
6
7
3
2
4
5
INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS
1) Battery Breaker
INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS