background image

Installation

4.1 

Installation Prerequisites

When assembling the system, avoid touching the battery terminal with any metal 

+

objects or bare hands. Q.HOME  BAT-G1 provides a safe source of electrical energy 

when operated as designed. Potentially hazardous circumstances such as 

excessive heat or electrolyte leakage may occur under improper operating 

conditions, damage, misuse and abuse. The previous safety precautions and the 

warning messages described in this section must be observed. If any of the 

previous precautions are not fully understood, or if you have any questions, 

contact customer service for guidance. The Safety Section may not include all 

regulations for your region.

Ensure that the installation location meets the following conditions:

Ÿ

The building is designed to withstand earthquakes

Ÿ

The location is far from the sea to avoid salt water and humidity, over 0.62 miles

Ÿ

The floor is flat and level

Ÿ

There are no flammable or explosive materials, at a minimum of 3ft

Ÿ

The ambiance is shady and cool, away from heat and direct sunlight

Ÿ

The temperature and humidity remain at constant levels

Ÿ

There is minimal dust and dirt in the area

Ÿ

There are no corrosive gases present, including ammonia and acid vapor

4.2 

Safety Gear

Insulated Gloves

Safety Goggles

Safety Shoes

4. Installation

12

13

4. Installation

4.3 

Tools

+

These tools are required to install the Q.HOME  BAT-G1 system.

Torque Screw Driver

Phillips-Screw Driver

Hexagon Wrench

Phillips-Head Screw Driver Flat-Head Screw Driver Torque Wrench

Tape Measure

Drill

Pencil or Marker

4.4 

 Installation

4.4.1  

Check for Transport Damage

Ensure the battery is intact during and after transportation. If there are visible 

damages such as cracks, contact your dealer immediately.

4.4.2  

Unpacking

NOTE!

CAUTION!

According to regional regulations, several people may be required for 

moving the

equipment.

WARNING!

If the ambient temperature exceeds the operating range, the battery 
pack will stop operating to protect itself. The optimal temperature 

range for operation is 59°F to 86°F. Frequent exposure to harsh 
temperatures may deteriorate the performance and lifetime of the 
battery module.

Unpack the battery package by removing the packing tape. Ensure the 
battery modules and relevant items are complete. See the package items on 

section 4.4.3 and check the packing list carefully. If any items are missing, 
immediately contact Q CELLS or your distributor directly.

Strictly follow the installation steps. Q CELLS will not be 

responsible for any injuries or loss incurred by incorrect assembly 
and operation.

INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS

INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS

Installation and maintenance personnel must operate according to applicable 

federal, state, and local regulations as well as industry standards regarding 
product installation. Personnel must wear safety gear as indicated below in 

order to avoid short circuit and personal injury. 

In practice, the requirements of battery installation may be different due to enviroment 

and locations. In that case, follow up the exact requirements of the local laws

 

and  

standards.

Содержание Q.HOME ESS HYB-G1

Страница 1: ...Q HOME ESS HYB G1 Lithium Battery Series 45Ah 63Ah Valid for North America INSTALLATION AND OPERATION MANUAL Hanwha Q CELLS America Inc 614 00447 01...

Страница 2: ...LLER 3 PRODUCT INTRODUCTION 3 1 PRODUCT OVERVIEW 3 1 1 DIMENSIONS AND WEIGHT 3 1 2 APPEARANCE 3 2 BASIC FEATURES 3 2 1 FEATURES 3 2 2 CERTIFICATIONS 3 3 SPECIFICATIONS 3 3 1 Q HOME BAT G1 CONFIGURATIO...

Страница 3: ...SIONING 5 1 CONFIGURING BATTERY SYSTEM 5 2 COMMISSIONING 5 3 STATUS INDICATORS 5 3 1 BMS Master Box 5 3 2 BATTERY MODULE BAT45 BAT63 5 4 SHUTTING DOWN Q HOME BAT G1 SYSTEM 6 TROUBLESHOOTING 6 1 TROUBL...

Страница 4: ...ON AND OPERATION MANUAL LITHIUM ION BATTERY Q CELLS Observe the following precautions Risks of explosion Risks of fire Do not subject the battery module to heavy impacts Do not crush or puncture the b...

Страница 5: ...wet or submerged in water do not try to access it If the battery module seems to be damaged it is not fit for use and may pose a danger to people or property Please pack the battery in its original pa...

Страница 6: ...fore performing installation 3 1 1 Dimensions and Weight A battery management system BMS is any electronic system that manages a rechargeable battery A battery module is a type of electrical battery w...

Страница 7: ...tion view of Q HOME BAT G1 Object Mark Description I II III IV V VI XPLUG RS485 I GND RS485 II YPLUG Power Connector to BMS or YPLUG of upper battery module RS485 Connector to BMS or RS485 II of upper...

Страница 8: ...3 BAT12 6 BAT18 9 BMS BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 Battery Module Q HOME BAT G1 4 5X1 Q HOME BAT G1 4 5X2 Q HOME BAT G1 4 5X3 Q HOME BAT G1 6 3X1 Q HO...

Страница 9: ...Flat Head Screw Driver Torque Wrench Tape Measure Drill Pencil or Marker 4 4 Installation 4 4 1 Check for Transport Damage Ensure the battery is intact during and after transportation If there are vis...

Страница 10: ...ty 1 1 1 1 1 1 1 1 1 1 1 1 4 10 A B C E D F G I H J K L M N Battery Module BAT45 BAT63 Quantity 1 1 1 1 5 1 2 12 1 1 2 Object A1 B1 C1 D1 E1 F1 G1 H1 I1 J1 K1 Description Power Cable between Battery M...

Страница 11: ...ed to ambient air The system is cooled by natural convection If the system is entirely or partially covered or shielded it may cause the system to stop operating CAUTION CAUTION The space between batt...

Страница 12: ...Connection 4 5 1 Connecting Power Cables For one battery module The color at both ends of the power cable between the BMS and battery module C is orange This cable is connected to the XPLUG which is o...

Страница 13: ...er K1 unlocked until the cables are correctly connected to the YPLUG Refer to the installation diagram on the right 5 On the right side of the BMS after the charging cables refer to section 4 5 5 and...

Страница 14: ...r use 3 Push the plastic button on each end of the power cable in the direction of the arrow Notes for Unplugging Power Cables Lock Cover 22 23 DANGER CAUTION Do not plug or unplug the power cables wh...

Страница 15: ...I RS485II VCC_485 VCC_485 GND_485 GND_485 B2 B2 N N P P A2 A2 VCC_485_2 VCC_485_2 GND_485 GND_485 The wire order of the communication cable is as follows 1 2 3 4 5 6 7 8 1 Orange stripes on white 2 Or...

Страница 16: ...ect port on both the inverter and BMS 2 Connect the negative cable B to the port on the right and the positive cable A to the port on the left 4 5 5 Connecting the Charging Cables This step details in...

Страница 17: ...stem installation with terminal boxes and conduit Installers are responsible for preparing conduit according to AHJ requirements Conduit size shall be 0 5in for the smaller hole and 1 1 25in for the l...

Страница 18: ...onfigure the DIP VI to the corresponding number according to the number of battery module s that has have been installed 2 Remove the cover board of the BMS 3 Move the circuit breaker switch V to the...

Страница 19: ...e LED indicators flash once evey 5 seconds The following table shows the status of the BMS Capacity Status Capacity Status Charging Discharging 5 3 2 Battery Module BAT45 BAT63 5 4 Shutting Down Q HOM...

Страница 20: ...protection BMS_DishargeOCP Battery discharge over current protection Warning Messages Description Troubleshooting 6 Troubleshooting BMS_TemHigh Battery over temperature BMS_TemLow Battery under temper...

Страница 21: ...efects that result from the following causes Force majeure flooding lightning strike overvoltage fire thunderstorm flooding etc Improper or noncompliant use Improper installation commissioning start u...

Отзывы: