background image

4. Installation

4. Installation

24

25

4.5.2 

Connecting the

RS485 Communication Cable

For one battery module:

1) There is a protection cover for the RS485 connector. Unscrew the cover and plug 

one end of the RS485 communication cable to the RS485 connector. Tighten the 

plastic screw nut which is set on the cable with a rotation wrench.
2) Connect the RS485 communication cable (E) from the left side of the BMS (III) to 
the RS485 I communication port (II’) that is on the left side of the battery 

module. The communication ports are marked in the following figures.

For 2

-

3 battery modules:

1) There is a protection cover for the RS485 connector.

 Unscrew the cover and plug 

one end of the RS485 communication cable to the RS485 connector. Tighten the 

plastic screw nut which is set on the cable with a rotation wrench.
2) Connect the RS485 communication cable (E) from the left side of the BMS (III) to 
the RS485 I communication port (II’) that is on the left side of the battery 

module. The communication ports are marked in the figures below.
3) Connect the

RS485 II  (IV’) of the

upper battery module on the right side to  

RS485 I (II’)

of the follow-up battery module.

Sequence

1

2

3

4

5

6

7

8

RS485I
RS485II

VCC_485
VCC_485

GND_485
GND_485

B2
B2

N-
N-

P+
P+

A2
A2

VCC_485_2
VCC_485_2

GND_485
GND_485

The wire order of the communication cable is as follows:

1 2 3 4 5 6 7 8

1) Orange stripes on white

2) Orange

3) Green stripes on white

4) Blue

5) Blue stripes on white

6) Green

7) Brown stripes on white

8) Brown

4.5.3 

Connecting the CAN Communication Cable

It is required for the BMS to communicate with the inverter for proper operation.
Note that the CAN communication cable is shielded with steel tubes.  

Refer to the installation diagram in section 4.5.1 on page 20.

2) After the charging cables and CAN 

communication cable are correctly connected and 

placed through the conduit, lock the terminal 

box-small (J) and terminal box cover (K) with M4 

screws (N).

1) Connect one end of the CAN communication 

cable (D) to the CAN connector (VII) marked in red.  

Tighten the cover set on the cable with a rotation 

wrench (G).

The wire order of the communication cable is the same as the

RS485  

Sequence

1

2

3

4

5

6

7

8

CAN

/

/

/

CAN_H CAN_L

/

A1

B1

3) Turn off the inverter AC switch, position the other 

end of the CAN communication cable (D) through 

the conduit and insert it into the BMS port on the 

inverter. Assemble the cable gland and screw 

the cable nut.

CAN

BAT

+

-

INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS

INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS

communication

 

cable.

Содержание Q.HOME ESS HYB-G1

Страница 1: ...Q HOME ESS HYB G1 Lithium Battery Series 45Ah 63Ah Valid for North America INSTALLATION AND OPERATION MANUAL Hanwha Q CELLS America Inc 614 00447 01...

Страница 2: ...LLER 3 PRODUCT INTRODUCTION 3 1 PRODUCT OVERVIEW 3 1 1 DIMENSIONS AND WEIGHT 3 1 2 APPEARANCE 3 2 BASIC FEATURES 3 2 1 FEATURES 3 2 2 CERTIFICATIONS 3 3 SPECIFICATIONS 3 3 1 Q HOME BAT G1 CONFIGURATIO...

Страница 3: ...SIONING 5 1 CONFIGURING BATTERY SYSTEM 5 2 COMMISSIONING 5 3 STATUS INDICATORS 5 3 1 BMS Master Box 5 3 2 BATTERY MODULE BAT45 BAT63 5 4 SHUTTING DOWN Q HOME BAT G1 SYSTEM 6 TROUBLESHOOTING 6 1 TROUBL...

Страница 4: ...ON AND OPERATION MANUAL LITHIUM ION BATTERY Q CELLS Observe the following precautions Risks of explosion Risks of fire Do not subject the battery module to heavy impacts Do not crush or puncture the b...

Страница 5: ...wet or submerged in water do not try to access it If the battery module seems to be damaged it is not fit for use and may pose a danger to people or property Please pack the battery in its original pa...

Страница 6: ...fore performing installation 3 1 1 Dimensions and Weight A battery management system BMS is any electronic system that manages a rechargeable battery A battery module is a type of electrical battery w...

Страница 7: ...tion view of Q HOME BAT G1 Object Mark Description I II III IV V VI XPLUG RS485 I GND RS485 II YPLUG Power Connector to BMS or YPLUG of upper battery module RS485 Connector to BMS or RS485 II of upper...

Страница 8: ...3 BAT12 6 BAT18 9 BMS BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 BAT BMS G1x1 Battery Module Q HOME BAT G1 4 5X1 Q HOME BAT G1 4 5X2 Q HOME BAT G1 4 5X3 Q HOME BAT G1 6 3X1 Q HO...

Страница 9: ...Flat Head Screw Driver Torque Wrench Tape Measure Drill Pencil or Marker 4 4 Installation 4 4 1 Check for Transport Damage Ensure the battery is intact during and after transportation If there are vis...

Страница 10: ...ty 1 1 1 1 1 1 1 1 1 1 1 1 4 10 A B C E D F G I H J K L M N Battery Module BAT45 BAT63 Quantity 1 1 1 1 5 1 2 12 1 1 2 Object A1 B1 C1 D1 E1 F1 G1 H1 I1 J1 K1 Description Power Cable between Battery M...

Страница 11: ...ed to ambient air The system is cooled by natural convection If the system is entirely or partially covered or shielded it may cause the system to stop operating CAUTION CAUTION The space between batt...

Страница 12: ...Connection 4 5 1 Connecting Power Cables For one battery module The color at both ends of the power cable between the BMS and battery module C is orange This cable is connected to the XPLUG which is o...

Страница 13: ...er K1 unlocked until the cables are correctly connected to the YPLUG Refer to the installation diagram on the right 5 On the right side of the BMS after the charging cables refer to section 4 5 5 and...

Страница 14: ...r use 3 Push the plastic button on each end of the power cable in the direction of the arrow Notes for Unplugging Power Cables Lock Cover 22 23 DANGER CAUTION Do not plug or unplug the power cables wh...

Страница 15: ...I RS485II VCC_485 VCC_485 GND_485 GND_485 B2 B2 N N P P A2 A2 VCC_485_2 VCC_485_2 GND_485 GND_485 The wire order of the communication cable is as follows 1 2 3 4 5 6 7 8 1 Orange stripes on white 2 Or...

Страница 16: ...ect port on both the inverter and BMS 2 Connect the negative cable B to the port on the right and the positive cable A to the port on the left 4 5 5 Connecting the Charging Cables This step details in...

Страница 17: ...stem installation with terminal boxes and conduit Installers are responsible for preparing conduit according to AHJ requirements Conduit size shall be 0 5in for the smaller hole and 1 1 25in for the l...

Страница 18: ...onfigure the DIP VI to the corresponding number according to the number of battery module s that has have been installed 2 Remove the cover board of the BMS 3 Move the circuit breaker switch V to the...

Страница 19: ...e LED indicators flash once evey 5 seconds The following table shows the status of the BMS Capacity Status Capacity Status Charging Discharging 5 3 2 Battery Module BAT45 BAT63 5 4 Shutting Down Q HOM...

Страница 20: ...protection BMS_DishargeOCP Battery discharge over current protection Warning Messages Description Troubleshooting 6 Troubleshooting BMS_TemHigh Battery over temperature BMS_TemLow Battery under temper...

Страница 21: ...efects that result from the following causes Force majeure flooding lightning strike overvoltage fire thunderstorm flooding etc Improper or noncompliant use Improper installation commissioning start u...

Отзывы: