4. Installation
4. Installation
16
17
4.4.4
Install BMS to Battery Module
4.4.5
Mounting Steps
Floor Mounting:
Step 1: Fix the wall bracket
on the wall
Ÿ
The distance between the bottom of a battery module and the lower hole of the
wall bracket should be 14.76in. Measure it and mark the position of the two holes
Ÿ
Drill holes with a drill, making sure the holes are deep enough (at least 1.97in)
for installation and tighten the expansion screw sleeves
Ÿ
Install the expansion screw sleeves (E1) on the wall, and screw the wall bracket
(D1) by using a wrench
Step 2: Remove the lower installed hanging board
Step 3: Match the battery module with the wall bracket (D1)
Ÿ
Transport the battery module to the wall bracket
Ÿ
Hang the battery module over the wall bracket, move the battery module
close to it and match it on the wall bracket
The following figure shows the back view of the wall mounted installation
CAUTION!
Ensure that the system is always exposed to ambient air. The system
is cooled by natural convection. If the system is entirely or partially
covered or shielded, it may cause the system to stop operating.
CAUTION!
CAUTION!
The space between battery modules must be at least 9.84in.
14.76in
9
.
84in
Place the BMS on top of the battery module and affix it with M5 screws (M)
using an L-type wrench (I). Ensure that the BMS and battery unit align on
matching sides as shown in the diagram below.
There are two mounting modes to choose between: floor mounting mode
and wall mounting mode. Installers can choose either mode according to the
homeowner's needs. However, once a mode is selected and the installation
has begun, the installer will need to find the appropriate expansion screen
sleeves to change modes.
Floor mounting or wall mounting is a mandatory requirement for installation.
Cable connection errors may occur if the battery modules are not aligned in
a row with matching front sides.
Finish the floor mounting or wall mounting before connecting the cables.
INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS
INSTALLATION AND OPERATION MANUAL LITHIUM-ION BATTERY – Q CELLS