14
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2020
Installation Procedure
Programming
6.1 Plug into an uninterrupted electrical outlet.
Note: All electrical connections must be connected accordingly to local codes.
6.2 Proceed to ‘Programming’ section
12
Connecting the Overflow
11
Connect tubing onto the 5/8” overflow
fitting (tubing not supplied) and run the
line to the drain.
Do not connect the
overflow into the drain line
, as it must
be a direct and separate line to the
drain. Allow an air gap as per the drain
line. Make sure the drain is not higher
than the overflow.
Overflow
Brine
Содержание SOL-TA Series
Страница 32: ......