20
Installation & Operation Manual
Copyright © Puretec Pty Ltd 2020
14.
Set Relay Actuation Time or Litres
using ▲ or ▼.
• Relay Actuation Time:
After the start of a regeneration
the amount of time that should pass prior to activating
the relay. The start of regeneration is defined as the first
backwash cycle or Dn brine/Up brine cycle, whichever
comes first. Ranges from 1 second to 200 minutes.
• Relay Actuation Litres:
Relay activates after a set
number of litres has passed through the meter when
the valve is in the service mode. Ranges from 1 to 200
litres.
Press "NEXT" to go to the next step.
15.
Set Relay Deactivate Time
using ▲ or ▼.
• If "on" is selected in step 14 the relay will deactivate
after the time set has expired. Ranges from 1 second to
200 minutes.
• If "L on" or "L softening regen on" is selected in step 14
the relay will deactivate after the time set has expired
or after the meter stops registering flow, whichever
comes first. Ranges from 1 second to 20 minutes.
Press "NEXT" to exit Advanced Programming.
1. Press NEXT and ▼ simultaneously for 5 seconds and release.
Then press NEXT and ▼ simultaneously for 5 seconds and
release for a second time.
2. Use ▲ or ▼ to select 1.0 for 1" valve or 1.0Ґ for a twin valve.
Press NEXT to go to step 3.
DP Switch Programming
(Optional - change if required for DP Switch installation or for external backwash
control i.e BMS)
Step 14S
Step 15S
EXIT OEM SOFTENER SYSTEM SETUP
Step 6I
EXIT INSTALLER DISPLAY SETTINGS
Step 13S
Step 14S
Step 15S
EXIT OEM SOFTENER SYSTEM SETUP
Step 6I
EXIT INSTALLER DISPLAY SETTINGS
Step 1CS
Step 2CS
Step 3CS
Step 5CS
Step 1CS
Step 2CS
Step 3CS
Step 5CS
DP Switch Programming
Содержание SOL-TA Series
Страница 32: ......