
SECTION 1
PRONAR PWP900
1.9
(1)- right modules of the rotary tedder; (2)- left modules of the rotary tedder; (3)- supports;
(4)- transport lug; (5)- central connection fixing pin.
The machine should be firmly fastened on the transportation platform with strips or chains
equipped with a tensioning mechanism. The fastening equipment used must have a valid
safety certificate. Chocks or other objects without sharp edges should be placed under the
wheels of the tedder to prevent it from rolling. The chocks must be fixed to the platform of the
vehicle. Exercise due caution when lifting the machine. During reloading work, particular care
should be taken not to damage parts of the tedder's fittings or the paint coat.
ATTENTION
Nobody may be in the maneuvering zone when moving the rotary tedder to other means
of transport.
FIGURE 1.3
Location of centre of gravity of the rotary tedder in transport position.
TABLE 1.3
Centre of gravity.
Dimension (FIGURE 1.3)
Unit
PWP900
A
mm
1040
B
mm
1497
C
mm
1620
Содержание PWP900
Страница 2: ......
Страница 3: ...ROTARY TEDDER PRONAR PWP900 MACHINE IDENTIFICATION SYMBOL TYPE SERIAL NUMBER ...
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 21: ...SECTION 2 SAFETY ADVICE ...
Страница 33: ...SECTION 3 DESIGN AND OPERATION ...
Страница 35: ...SECTION 3 PRONAR PWP900 3 3 3 2 DESIGN AND OPERATION FIGURE 3 1 General design ...
Страница 39: ...SECTION 4 CORRECT USE ...
Страница 58: ...PRONAR PWP900 SECTION 4 4 20 ...
Страница 59: ...SECTION 5 MAINTENANCE ...
Страница 67: ...SECTION 5 PRONAR PWP900 5 9 FIGURE 5 3 Positions of the tedder s lubrication points ...
Страница 72: ...PRONAR PWP900 SECTION 5 5 14 ...
Страница 73: ...NOTES ...
Страница 74: ......