
Table of contents
Identity code ordering system for DULCOTROL
uring and control panels........................................................ 6
Safety and responsibility....................................................... 9
2.1 Labelling of Warning Information.................................. 9
2.2 General Safety Information......................................... 10
2.3 Information in the event of an emergency.................. 13
2.4 Intended Use.............................................................. 14
2.5 User qualification........................................................ 15
About this product............................................................... 16
3.1 DULCOTROL
measuring and control stations.......... 16
Storage and Transport........................................................ 20
Overview of the measuring point........................................ 21
5.1 DULCOTROL
Measuring and Control Station with
Bypass Fitting DGMa.................................................. 21
Measuring and Control Station with
Bypass Fitting DLG III................................................. 22
5.3 Installation Diagram for DULCOTROL
and Control Station..................................................... 24
Assembling the measuring point......................................... 25
6.1 Assembly (mechanical)............................................... 25
6.1.1 Measuring point....................................................... 27
6.1.2 Accessories............................................................. 28
Installing Sensors in the Bypass Fitting DGMa................... 29
7.1 Fitting the DGMa with Sensors................................... 30
7.2 Electrical Installation of the Sensors........................... 31
7.3 Adjusting the Flow Sensor Switching Point................ 32
Installing sensors in the bypass fitting DLG III/IV................ 33
8.1 Fitting the DLG with sensors....................................... 34
8.2 Hydraulic Installation................................................... 35
8.3 Electrical Installation of the Sensors........................... 35
8.4 Starting Up the DLG................................................... 37
Electrically and hydraulically assembling and installing the
measuring points................................................................. 38
9.1 Identity code for “sample water” designated “H”......... 39
9.2 Electrical installation of the measuring and control
station......................................................................... 39
9.2.1 Wiring diagram for DACb and measuring plate....... 42
9.2.2 Wiring diagram for DACb and measuring plate - flu‐
oride......................................................................... 43
9.2.3 Wiring diagram for DACb and measuring plate -
Conductive conductivity........................................... 44
9.2.4 Wiring diagram for DACb, DCC and measuring
plate - Inductive conductivity.................................... 45
9.3 Hydraulic Test Run after Installation........................... 46
10 Starting-up Sensors............................................................ 48
10.1 Preparation of Sensors............................................. 48
10.2 Sampling from the Bypass Fitting............................. 49
10.3 Calibrating the Sensors............................................ 50
10.4 Calibrating the Fluoride Sensor................................ 50
Table of contents
3
Содержание DULCOTROL DWCa
Страница 139: ...139 ...