
Jetzt Angebot anfordern auf www.poolseller.de
»
NOTICE DE MONTAGE
/ OCTO & OCTO +
70
CAUTION:
This type of configuration must be protected by one of the four safety systems that comply with French
safety standards concerning safety of in-ground pools; safety barrire, alarm, safety cover or a shelter.
The decree no. 2003-1389 dated 31/12/2003 renders it mandatory for clients of pools installed after the 1st of
January to have the pool fitted with a system to prevent drowning before it is filled with water. Said system must comply
with either the French safety standards, or with those standards, technical specifications or manufacturing procedures set
out in the regulations of a member state of the European Community or another state party to the Agreement on the
European Economic Area, providing for an equivalent level of safety.
These provisions apply to open air pools that are partially or fully in-ground.
Below, we suggest implementation configurations that show basic recommendations for non-humid ground. You
should adapt these to your installation, notably, in humid areas (stagnant water, water source, zone subject to flooding,
etc.) a sump drain pump may be required for efficient drainage.
In any case, the drainage system must be adequate to prevent the stagnation of water that could cause the wood
to rot. We recommend that you follow the installation instructions to the letter; failure to abide by these instructions will
render the usual guarantees null and void.
Should you have any questions, and to ensure a quality installation, do not hesitate to contact a specialist.
>>
IMPLEMENTATION FOR PARTIALLY IN-GROUND OR
IN-GROUND POOLS
>>
OCTO POOLS
For selection of the site, refer to the instructions at the
beginning of this document.
Once the excavation is at the required depth, make sure
that the surface is perfectly flat and level. Next, dig a trench to
allow drainage under the walls of the pool. Trace the shape of
the trench, to assist this process you may temporarily assemble
the first row of slats (illustration 5). It should be wide enough
to extend beyond each side of the wall once it is built.
If you intend to install the filtration system in a box
adjoined to the pool, remember to dig a trench to run the
power cable. Similarly, if the filtration system is to be installed
at a distance from the pool, dig a trench to accommodate
passage of the suction and return lines.
Max. depth of the excavation:
pool height 120cm = 116cm
pool height 133cm = 129cm
Illustrations shown in this document are valid for a filtration system housed in a box buried at the same level as the pool.
Should you choose another configuration, abide by the instructions above.
After the trench under the pool wall is dug, fill it to a depth
of approximately 10cm using small sized gravel. Make sure
that the gravel is well compacted to avoid future subsidence
that will impact the pool structure. Finish filling the trench
with compacted sand, the filled trench should be level with
the ground.
CAUTION!
We strongly recommend that you install the filter
below the water line. If the filter is installed above the water
line, there is a risk of deformation due to depressurisation.
At most, the filter should be installed level with the coping.
In the event that the filter is installed above the water
line, mount a check vent on the return line and an easily
accessible check valve on the suction line.
A
B
»
INSTALLATION INSTRUCTIONS
/ OCTO & OCTO +
Jetzt Angebot anfordern auf www.poolseller.de