Jetzt Angebot anfordern auf www.poolseller.de
»
NOTICE DE MONTAGE
/ OCTO & OCTO +
52
>>
ASSEMBLY OF THE OCTO + POOL STRUCTURE (contd.)
At this point, fit the skimmer into the machined slat (F). Slot the top skimmer slat (G) over slat F and continue around the
pool, fitting 2 type H slats, 1 type l slat and 4 type J half-slats into position as shown.
Attach a decorative trim (type K) to the end of each wall
using 4 3.1x75mm screws (bag L) inserted through holes
pre-drilled at regular intervals along the axis.
Working from the outside, screw the metallic posts (pre-
drilled) onto the wooden walls using 6x40mm screws from
bad C. Check their verticality. Position two decorative
profiles (Q) on either side of each post and fasten them
together using 3 5x70 screws (bag C) as shown.
The wooden brackets are designed to support the coping
after the pool is filled. Pre-drill the wall, then, working
from inside the pool, fasten each coping support bracket
(L) in position using 2 5x100mm screws (bag l), taking
care to ensure that each bracket is 3mm beneath the
top of the pool structure. Check the verticality of each
support bracket.
The short sides of the 540 pools should be fitted with 2
coping support brackets.
The short sides of the 640 and 840 pools should be
fitted with 3 coping support brackets, except for the side
holding the skimmer which should be fitted with 2 coping
support brackets. (illustration 40).
31
32
33
34
35
36
36’
»
INSTALLATION INSTRUCTIONS
/ OCTO & OCTO +
Jetzt Angebot anfordern auf www.poolseller.de