Encase the base
of the metal posts
with a small amount
of concrete before
pouring the rest of
the slab, this will help
prevent deformation of
the metallic structure.
(fi g. 9a).
See fi gures 7 and 9b to
determine the correct
height of the concrete
slab with respect to the
posts.
The fi nish of the
concrete slab will
determine the correct
seating of the walls as
well as the quality of the
pool fl oor.
Encase the base
Encase the base
Encase the base
Encase the base
Encase the base
of the metal posts
Encase the base
of the metal posts
Encase the base
Encase the base
of the metal posts
Encase the base
of the metal posts
of the metal posts
of the metal posts
of the metal posts
with a small amount
of the metal posts
of the metal posts
with a small amount
of the metal posts
with a small amount
of the metal posts
with a small amount
of the metal posts
with a small amount
with a small amount
with a small amount
with a small amount
with a small amount
of concrete before
with a small amount
of concrete before
with a small amount
of concrete before
of concrete before
of concrete before
of concrete before
pouring the rest of
of concrete before
pouring the rest of
of concrete before
pouring the rest of
pouring the rest of
pouring the rest of
pouring the rest of
the slab, this will help
pouring the rest of
pouring the rest of
the slab, this will help
pouring the rest of
the slab, this will help
the slab, this will help
the slab, this will help
prevent deformation of
the slab, this will help
prevent deformation of
the slab, this will help
prevent deformation of
prevent deformation of
prevent deformation of
prevent deformation of
the metallic structure.
prevent deformation of
the metallic structure.
the metallic structure.
the metallic structure.
See fi gures 7 and 9b to
See fi gures 7 and 9b to
Figure 9
>>
POURING THE CONCRETE SLAB
w
Lay the top layer of rebar (second layer) over the entire surface of the excavation
before pouring the concrete.
w
Once laid, the metal trellis should cover the whole surface (lay the trellis such that it is
set 3 to 5 cm back from the edge around the entire periphery). Some cutting around
the posts will be necessary (fi g 9a.). Bars should be allowed to overlap and should be
connected together.
w
While pouring the slab, make sure that the
upper rebar mesh is encased to a correct
depth in the concrete.
(minimum 3 cm)
w
Level the surface and smooth it as carefully
as possible in order to minimise protrusions
and asperities that will have to be corrected
later.
Figure 9b
Figure 9a
CAUTION