5
8)
Input circuit breaker
9)
Output terminals
10)
Output Ground
11)
Input Ground
12)
Input terminals
13)
Cooling Fan
14)
External maintenance bypass switch port
15)
Battery pack output circuit breaker
16)
External battery connector
2-3. Rack/Tower Installation
2-3-1 Tower Installation
The UPS system is shipped with two sets of feet and 6 extensions (2 short extensions plus 4 long extensions)
that can be used to tower install the UPS module in 2U or UPS module with one battery bank in 4U.
Install UPS module in 2U
Assemble two feet and one short extension as one tower stand shown in step 1. Align the two stands
approximately 35cm apart in step 2. Then, put UPS module in the stands as shown in step 3.
Step 1 Step 2 Step 3
Install UPS module and one battery bank in 4U
Assemble two feet and two long extensions as one tower stand shown in step 1. Align the two stands
approximately 35cm apart in step 2. Then, put UPS module and battery bank in the stands as shown in step
3.
Step 1 Step 2 Step 3
Содержание Centurion RT 6000VA
Страница 1: ......
Страница 30: ...27 6 Specifications...