11.1.2
CT Ratio Testing Results
Functionality:
Moves cursor up and down for selecting a CT to retest
Performs a retest on a highlighted CT
Retests all CT’s
Views the graphical test data for all CT’s
Views the numerical test data for all CT’s
Completes CT test and saves data
Description:
This screen displays the results of the CT test for each phase. A phase is always located at the
top graph, then the other two graphs correspond to B phase and C phase respectively. If the
user is testing a service type with only 1 or 2 CT’s present, the PowerMaster
®
will only test the
CT’s that are active for the particular service type.
The measured CT ratio value is displayed as “Measured Ratio.” This value is calculated from the
current readings from the secondary probe(s) and primary probe(s). Phase angle information is
also displayed as an angle or in minutes. Generally, the user desires the measured CT ratio
value to be as close as possible to the CT nameplate value. Once this is determined, the user
can specify the test to “pass” or “fail” according to their utility’s standard procedures.
Rev 1.5
89
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...