11.3.1
Direct Connections to CT with Common Neutral Phase
This set of instructions is applicable when all active CTs share a common neutral and/or ground.
STEP 1
Insert direct current probes
into test switch.
STEP 2
Connect the red (+) and white
(-) voltage cable connections
to the CT secondary for A
phase
STEP 3
Connect the yellow (+)
voltage cable connection to
the CT secondary for B phase
STEP 4
Connect the blue (+) voltage
cable connection to the CT
secondary for C phase
STEP 5
Verify Length is set to 0 and
“Simultaneous Measurement”
is selected. Press F6 to
continue.
STEP 6
Test will begin automatically
STEP 7
View results. Press F6 to
save and complete.
Rev 1.5
100
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...