6. When inserting duck bill probes into a test switch, short the CT secondary (+) first by
pulling the test switch in an open position. This will prevent possible arcing.
7. For clamp-on probes, clean contact surfaces and then snap and release the jaws to verify
a metal-to-metal contact of the jaws (dirt and grease may contaminate the surfaces).
8. For flexible probes, take care to pad mount CT installations. Always wear appropriate
PPE when inside the CT installation.
9. For pad mount CT installations, be wary of various items around the installation (chairs,
tables, etc.) which can potentially become a safety hazard.
Rev 1.5
10
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...