10.1 Customer Load Setup
Functionality:
Moves to next field
Moves to previous field
Enters drop down box and views test mode selections; checks/unchecks
check boxes
Moves cursor up and down for selecting a test mode in the drop down box
Resets any changes made back to default database values
Continues
Description:
This screen allows the user to perform a meter test using the customer’s load. This means that
the PowerMaster
®
will calculate the registration or error (based on user preference) over a set
timed period (either time or pulses). The end result is expressed as a percent.
FAQ’s
What is the difference between “Test Time” and “Test Revs”?
Test Time is the amount of seconds the user defines for the test. If the time exceeds before a
pulse is expected, the PowerMaster
®
will wait until the last pulse is seen before completing. Test
Revs is the amount of pulses or revolutions the meter test will count before completing. If both
Rev 1.5
74
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...