6.1.1 Main Menu (After Site Selection)
Once a site is selected all system test capabilities are selectable. These are:
1)
Select Site (select a site for analysis or access the site manager database editor)
2)
Integrated Site Test (automated test procedure which takes the user step-by-step
through a predefined test sequence.)
3)
Meter Testing (takes the user to the meter testing menu where various meter tests
methods are available)
4)
Instrument Transformer Testing (takes the user to the CT/PT testing options)
5)
Deselect Site (deactivates selected site and returns the user to a pre-site selection
Main Menu)
6)
Utilities (view or edit user preferences, other applications)
7)
Recall Data (view previously saved data).
Rev 1.5
35
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...