fields have values present, the meter test will complete when either value comes first (whether it
is time or revs).
How many “Revs” does Powermetrix recommend to perform an accurate meter test?
If time permits, 10 revs or more is ideal.
How do I perform a Var-Hr meter test?
First, make sure Test Mode is set to “VARh”. Next, verify the meter pulse pickup is aligned to
view Var-hr pulses and not Watt-hr. This may incorporate a meter programming change to do
this.
10.1.1
Customer Load Setup With Demand Test
Functionality:
Moves to next field
Moves to previous field
Enters drop down box and views test mode selections; checks/unchecks
check boxes
Moves cursor up and down for selecting a test mode in the drop down box
Resets any changes made to default database values
Rev 1.5
75
Содержание PowerMaster 3 Series
Страница 1: ...PowerMaster 3 Series Firmware Version 2 0 0 10 Product Manual Revision 1 5 Rev 1 5 1...
Страница 57: ...Meter View Connection View Rev 1 5 57...
Страница 78: ...Rev 1 5 78...
Страница 96: ...11 2 1 CT Testing Results Graphs 11 2 1 1 CT Testing Results Data Description Rev 1 5 96...
Страница 154: ...302 305 and 335 accessories maintain IEC 61010 compliance only when connected to a complaint 3 Series Rev 1 5 154...