- 5 -
0600_GB-Power-Control_8537
GB
POWEr COnTrOL - OPErATiOn
- Press
“Ok” key
until tone signal is heard
- System-New Start will be carried out
Note! All data will be reset to the pre-programmed
standard values.
• Press
“ESC” key
- procedure is interrupted
Switching on operating device
Switching on
operating device
- briefly pressing I/O button
Start-up
screen appears
work menu
overlays secs. later
System-New Start
With this the pre-programmed standard values are
activated.
After System-New Start the
- base settings for the seed drill are to be checked
- and adapt the control to the seed drill if necessary.
• Press
“MENU” key
- Menu base setting appears
Select from the menu using
- wiht keys "
or
"
or
Auswahl von Menüpunkt
Software versions
(= Software-Versionen)
- Press
“Ok” key
- “Software versions” menu appears
• Press
“GRD” key
- Question “Implement normal state?”
(=Grundzustand herstellen?)
Pre-programmed standard values
Function
Standard
Your own
Seed quantity adjustment
On
Seed type
Wheat
Quantity of seed
180 kg/ha
Variation in seed
quantity in %age
10 %
Quantity reduction
On
Closed seed tubes
4
Driving lane rhythm
symmetrical
– 8
Stutter switch
Off
Length of strips
5m
Sowing shaft monitor
5s On
Level monitor
15% On
Blower monitor
000 UpM
On
Monitoring of Calibration
flapss
On
Time-invariant driving
lane sensor
,5 secs
Ha.meter impulses
805
Driving lane sensor
setting
normal
Level sensor setting
normal
Sensor setting for
Calibration flapss
normal
Machine type
Vitasem
Working width
m
No. of sowing tubes
24
No. of head outlets
24
Language
english
Note!
Check the base
settings of the
power control
before initial
operation.
Attention!
System-New
Start should
only be carried
if problems
occur during
“Power Control”
operation.
Note!
The desired
language for the
menu guide can
be set here.
Press
“L” key
Vitasem
S 2.9
--
D 2.0