12
GB
A
P
B
V1
V2
I
!
!
II
Mandrel
advanced
ultimately
POST 100x100
P
P
POST 70x70
30
30
I
II
!
1
Automatic system installation
Preparation of the gate
1
Level the gate leaves.
2
Set position of the automatic system.
3
Apply the prepared set to the previously leveled and closed gate.
The automatic system cannot rub against the gate fittings.
Содержание EASY WAY201
Страница 1: ...DRIVE UNIT FOR SWING GATES EASY WAY 201 ...
Страница 9: ...9 GB 6 5 7 5 10 5 13 10 Preparation for assembly Necessary tools ...
Страница 37: ...37 GB ...
Страница 38: ...38 GB ...
Страница 39: ...39 GB ...
Страница 40: ...ul Deptak 17 04 956 Warszawa tel 48 022 872 00 91 93 fax 48 022 612 68 60 serwis polargos pl www polargos eu ...