background image

10

GB

23

1

Crossbar

Electronic module

Junction box

(not included in the delivery)

(cable 2 x 1 mm

2

 between drives;

cable 2 x 0.75 mm

2

 between photocells)

2 3

Flexible shield ICT

Power supply connection: (3 x 1.5 mm

2

)

Connection of 24 V between two drive units: (2 x 1 mm

2

)

1.

2.

   Preparation for assembly

  Preliminary wiring system

 
 

To install the gate drive, proceed as follows:

 

●  Lay down a power supply of 230 V to one of the posts and as close to the drive unit as possible.

 

●  Connect the post together using a cable 2 x 1 mm2 (not included in the delivery).

 

  Provide a shield Orange ICT Ø 25 mm for cables located underground.

 

  If cables cannot be led underground between the posts, use a cable bush that can withstand the 

 

  weight of vehicles.

 

  Mains supply

 

To ensure operation of the gate opening mechanism,

 

connect a power supply of 230 V – 50 Hz to it.

 

The electrical supply cable must be:

 

● 

Designated for the gate opening mechanism only.

  Protected:  - by means of a fuse or a circuit breaker 10 A,
         

- by means of a differential-current switch (30 mA).

 

● 

Installed in accordance with the safety standards concerning wiring systems and  

    effective in the country of use.

 

  Multipole disconnection of the power supply is to be provided:

 

● 

using a supply cable with a plug

 

● 

or by means of a switch where a distance between contacts is at least 3 mm for   

    each pole (according to EN 60335-1).

It is recommended to install a lightning arrester (maximum residual voltage 2 kV).

Содержание EASY WAY201

Страница 1: ...DRIVE UNIT FOR SWING GATES EASY WAY 201 ...

Страница 2: ...P 1x L 1x G 1x F 1x 2 SETS 8 SETS this lock screw is designed for gates mounted on steel posts 70 x 70 mm if the gate is to be mounted on steel posts 100 x 100 mm 8 sets of lock sc rews M8 x 120 mm should be obtained Depending on the model purchased a suitable connector should be added to the set ...

Страница 3: ...nciples 5 Product description 6 Preparation for assembly 8 Installation 1 Automatic system installation 12 2 Electrical connections 17 3 Parameter setting 20 Operational use 26 Troubleshooting 28 Accessories 29 In the case of a solar energy supply 35 ...

Страница 4: ...g facilities POLARGOS manufactures products for a large number of domestic and foreign customers Our aim is to supply products that meet the highest standards of workmanship and fulfill customers expectations as regards aesthetics and the dominant trends in the fence market Thank you for placing your confidence by choosing EASY WAY 201 Please read this instruction book thoroughly before installati...

Страница 5: ...lly Before installation of the drive unit check if the driven part is in good technical condition properly balanced and if it opens and closes well Do not pass between the moving part and close fixed elements in view of the danger connected with the move ment of the driven parts during opening crushing cropping jamming Observe the gate during its movement All switches without interlock must be in ...

Страница 6: ...2 453 Attachment A Working temperature Between 20 C and 60 C Thermal shield Yes Protection level IP 55 for electronic components IP 44 for drives Built in radio wave receiver Yes Remote controls Radio frequency 433 42 MHz Range of operational use 30 m Number of memory settings 16 Possible connections Orange light output Flashing 24 V 10 W Zone lighting output supplied terminals Max 500 W at 230 V ...

Страница 7: ...00 kg H 2 00 m L 2 00 m Width of each leaf should be between 1 m and L Maximum opening angle for hinges fastened to the post side Dimensions in mm Opening limiter The motor stops automatically using its internal limiter To stop the gate earlier fix a limiter not included in the delivery on the ground to stop the leaves ...

Страница 8: ...es without use of force The gate remains in a level position during the whole movement cycle It opens inwards to the garden Gate types only with frames made of metal Subject to observance of the dimensions specified on page 7 Inspection of posts The posts must be at least 70 mm wide Otherwise reconstruction may appear necessary to ensure proper corner embedment and fastening ...

Страница 9: ...9 GB 6 5 7 5 10 5 13 10 Preparation for assembly Necessary tools ...

Страница 10: ...If cables cannot be led underground between the posts use a cable bush that can withstand the weight of vehicles Mains supply To ensure operation of the gate opening mechanism connect a power supply of 230 V 50 Hz to it The electrical supply cable must be Designated for the gate opening mechanism only Protected by means of a fuse or a circuit breaker 10 A by means of a differential current switch ...

Страница 11: ... L II I 8 SETS M8 x 120 mm H 8 SETS M8 x 85 mm H Preparation for assembly Preparation of connectors In case I use the lock screws M8 x 85 mm included in the delivery In case II where the metallic posts have dimensions 100 x 100 mm provide 8 sets of lock screws M8 x 120 mm ...

Страница 12: ...P POST 70x70 30 30 I II 1 Automatic system installation Preparation of the gate 1 Level the gate leaves 2 Set position of the automatic system 3 Apply the prepared set to the previously leveled and closed gate The automatic system cannot rub against the gate fittings ...

Страница 13: ... connectors P and L using a clamp Apply the automatic system to the gate and see which holes in the gate crossbar line up with the bean shaped holes in the connector V1 use two selected bean shaped holes 5 Attach the connector to the gate with screws Do not tighten all the way Some adjustment of the connector by gentle movement should be possible ...

Страница 14: ...14 GB P H 1 Automatic system installation 6 Next attach the connector to the post with the gate closed The post must be drilled with a drill bit 10 5 7 Screw the connector to the post 10 5 ...

Страница 15: ...to the suitably attached connectors 9 Check the position of the connector on the gate once again and adjust it if necessary 10 Remove the automatic system Choose one hole in the connector that does not interfere with a rail In its position drill the gate crossbar with a drill 6 5 Then ream the hole with a drill 7 5 from the street side Fit the locking screw M6 x 40 mm 7 5 6 5 ...

Страница 16: ...g the leaf V1 or V2 using the screw C To use the unlocking element properly follow the assembly direction as shown in the diagram Do not mount the screw from below 12 Fix the yoke fastening the leaf V1 or V2 on the driving mandrel Attach the unlocking element D to the drive spindle to lock the mandrel 13 Repeat step 1 12 for the second gate leaf ...

Страница 17: ...ld be mounted on the same side as the source of power supply Fixing the electrical box on the post 1 Place the box at the post preferably over one meter above the ground and use the template to drill installation holes 2 Put the electronic system in the box Press it slightly for proper location Fix the system using the mounting screws included in the delivery kit The box shall be mounted with the ...

Страница 18: ...e mounted on the post of the leaf that opens first and closes last M2 M1 The servomotor M1 moves the right leaf that opens as the first one and closes as the last one Cables of servomotors Servomotor M1 must be always connected to terminals 11 and 12 Servomotor M2 must be always connected to terminals 13 and 14 The colours of cables used may vary from these shown in the manual Please take this int...

Страница 19: ...these operations must be carried out with the power supply disconnected 1 Insert the cable into the gland 2 Connect the earth wire The earth wire green yellow will be needed for some accessories lighting 230 V Class I 3 Connect the live and the neutral Check if the wires are locked properly by pulling them It is necessary to always follow the rules regarding cable colours without variation Blue wi...

Страница 20: ...ndicator DANGER is unlit Carry out the following operations Operation of remote controls The drive unit can be controlled by means of one or several remote controls The following operations must be repeated for each remote control to be programmed Two operating modes are available for the drive unit 9 Complete opening only Complete opening of 2 leaves by short or long pressing of the remotecontrol...

Страница 21: ... again no later than within 10 seconds and hold it down until the indicator PROG starts flashing slowly the indicator DANGER will be alight during push button pressing 4 Release the push button it has been memorized At the end of the programming cycle only indicators PROG and ON OFF emit light however the electronic system is awaiting memorization of the path of the leaves Changing the operating m...

Страница 22: ...bed in the section Programming of remote controls see information close by How to add remote controls with 3 push buttons Put the remote control in the place indicated on the housing 1 Press the push button UP or Down and hold it down until the indicator PROG starts flashing slowly the indicator DANGER will be alight during push button pressing 2 Release the push button the remote control has been...

Страница 23: ...e remote control push button After several seconds the gate starts opening at low speed If the gate does not open properly check the servomotor cables as shown on page 18 2 After the gate is open press longer the remote control push button once again The gate closes one leaf after the other 3 Press the same push button once again The gate opens still at low speed 4 Press the push button for the la...

Страница 24: ...e procedure of teaching of the movement path of leaves To this end restart programming of the remote control see page 22 Automatic mode adjustment Precautions To ensure the gate operation in automatic mode according to EN 12 453 it is necessary to install the following accessories that are available for the drive unit EASY WAY 201 photocell set description and cables see page 29 orange light descr...

Страница 25: ...ivate closing by shorter or longer pressing the remote control push button again Both leaves close almost simultaneously Indicator AUTO emits light continuously The automatic mode is now active Switchover from automatic mode to sequential mode To return to sequential mode indicator AUTO is lit Put the remote control in the place indicated on the housing Press the transmitter push button until the ...

Страница 26: ... in automatic mode In automatic mode pressing of the remote control push button results in the gate opening Closing occurs automatically after the period of time preset by the user You can stop the gate in the open position by short pressing of the remote control push button within the specified time Repeated pressing of the remote control push button results in the gate closing Operation of remot...

Страница 27: ... control If a vehicle is equipped with air conditioning and metalized windscreen aim the remote the control at the black bar found on the windscreen or at the side window Engagement disengagement of the servomotor For safety reasons these operations must be carried out after disconnecting the power supply Even in the case of a power cut restoration of power supply can occur at any moment 1 In case...

Страница 28: ...OFF is flashing quickly Servomotor is overheating wait for it to cool down Short circuit at the output s of the drive unit s contact the Service Department Servomotors M1 and M2 are not activated or the direction of their operation is not correct Check the connection to the electricity supply Check the extender between the two servomotors Check the servomotor cables if necessary exchange them see ...

Страница 29: ... conductors locate the receiving photocell on the post where the drive unit equipped with the electronic system is placed Before the connection of photocells remove the conductor jumper that is installed between the electronic module terminals 3 and 4 Wiring diagram for the photocell set In case of a solar energy supply see page 35 To ensure better operation of the photocells fit them with a shiel...

Страница 30: ...it directly Note Do not place the battery cable above a power supply source Operating time 10 cycles in continuous mode or 24 hours if the gate is in good technical condition Optimum charging time for the battery before use 48 hours Battery life 3 years To ensure optimum battery life disconnect the power supply from the gate three times a year and run several cycles with battery operated drive uni...

Страница 31: ...31 GB Accessories Description and connections Key switch Intercom Accessories incompatible with solar energy supply ...

Страница 32: ...GB T1 C1 R1 V R3 T2 C2 R2 T3 C3 H P2 M P1 H E V T1 C1 R1 V R3 T2 C2 R2 T3 C3 H P2 M P1 H E V Accessories Description and connections Cable panel with code Accessories incompatible with solar energy supply ...

Страница 33: ...33 GB Accessories Description and connections Wireless wall switch Radio panel with code Remote control with 2 push butt Remote control with 4 push buttons ...

Страница 34: ...ections External antenna An external antenna having a wider range can replace the wire antenna Place it on top of the post and check if it is exposed Connection to the electronic module conductor core to terminal 1 stranded aerial wire to the terminal 2 ...

Страница 35: ...ing programming and the drive unit operation remain the same as for a power supply of 230 V Connection to a solar system supply 1 Insert the cable into the gland of the electric box of the drive unit 2 Connect the supply cable from the solar power system to the terminal of the battery 3 Clamp the gland Check if the wire is connected properly by pulling it ...

Страница 36: ...36 GB RX TX 1 2 1 2 3 5 Accessories Photocells Wiring diagram for the photocell set Lamp for gate zone illumination 24V 25W ...

Страница 37: ...37 GB ...

Страница 38: ...38 GB ...

Страница 39: ...39 GB ...

Страница 40: ...ul Deptak 17 04 956 Warszawa tel 48 022 872 00 91 93 fax 48 022 612 68 60 serwis polargos pl www polargos eu ...

Отзывы: