23
EN
ENGLISH
33. MOUNTING HEAT TENT SUPPORTS
Parts Required :
3 x Heat Tent Supports
(#15)
1 x Gas Main Chamber
6 x M4x10 mm Screws
(#F)
Installation
:
• Attach three Heat Tent Supports to the front side of
Gas Main Chamber.
Use: 6 x M4x10 mm Screws
See Fig. 33.
FIG. 33
15
F
F
34. PLACING HEAT TENTS
Parts Required :
3 x Heat Tents
(#14)
3 x Heat Tent Supports
(#15)
Installation
:
• Place three Heat Tents onto the Heat Tent Supports.
See Fig. 34.
FIG. 34
15
14
14
35. MOUNTING CHARCOAL TRAY LIFT SYSTEM
Parts Required :
1 x Charcoal Tray Lifting System
(#12)
1 x Charcoal Main Chamber
4 x M6x10 mm Screws
(#D)
Installation
:
• Mount the Charcoal Tray Lifting System to the back
side of Charcoal Main Chamber.
Use: 4 x M6x10 mm Screws
See Fig. 35.
Note: Gas Lid needs to be closed prior to assembly.
FIG. 35
12
D
D