5 Installation
20
Version: 1.1.2
MP129E
Q-632 Miniature Rotation Stage
−
If you use locating pins for aligning the load: You made two to four locating holes of
Ø 1.5 mm H7 in the load for accommodating locating pins.
Tools and accessories
4 M2 screws of suitable length (p. 40)
Suitable tool for tightening the screws
Optional: 2 to 4 locating pins of suitable length, for locating holes with
∅
1.5 mm H7
Fixing the load to the Q-632
1.
Align the load on the Q-632 so that the mounting holes in the load and the holes in the
motion platform are aligned.
If you use locating pins to align the load:
a)
Insert the locating pins into the locating holes in the motion platform or in the load.
b)
Place the load on the motion platform so that the locating pins can be inserted into
the corresponding locating holes on the other side.
2.
Fix the load using the
screws.
−
Maximum torque: 35 Ncm.
3.
Check that the load is fixed firmly to the motion platform of the Q-632.
5.4
Connecting the Q-632 to the Electronics
INFORMATION
The Q-632 and the electronics can be delivered as a preconfigured system.
If a connection assignment is given on the labels of the Q-632 and/or electronics, pay
attention to this assignment when connecting the Q-632.