
Manual MCC-1
MA 1249-A009 EN
16
3 Protective Measure Options
The control unit must be operated by the protective measure PELV acc. to VDE 0100.
Board and motor housing have to be grounded and/or connected to 0 V.
Various options are possible to achieve the protective measure PELV:
Fig. 6: PELV
– Grounding: total
Fig. 7: PELV
– Grounding: Power Stage and Motor.
The secondary winding of the transformer (SELV supply) must not be grounded
because the equipment is grounded.
Fig. 8: PELV
– Grounding: 0 V and Motor
Содержание MCC-1
Страница 13: ...Manual MCC 1 MA 1249 A009 EN 12 1 6 Declaration of Incorporation...
Страница 26: ...phytron 25 MA 1249 A009 EN 1 Fig 12 Wall mounting MCC 1 dimensions Fig 13 Rail mounting MCC 1 dimensions...
Страница 45: ...Manual MCC 1 MA 1249 A009 EN 44 Fig 38 Enable Connector wiring...
Страница 54: ...Phytron GmbH Industriestra e 12 82194 Gr benzell T 49 8142 503 0 F 49 8142 503 190 www phytron eu...