CLASS NO.
A
ll
r
ights
s
tr
ic
tly
r
e
se
rv
ed
. R
epr
oduc
ti
on or
is
su
e
to
t
h
ir
d
p
ar
ties
in
an
y f
o
rm
w
h
at
ev
er
is
n
o
t
p
e
rm
it
te
d
w
ithout w
ri
tte
n a
u
thor
it
y,
fr
om
the
pr
opr
ie
tor
s
.
.
NAME
2838 100 05424
TY
CHECK
SUPERS
.
DATE
Property of
PHILIPS ELECTRONICS INDUSTRIES (TAIWAN) LTD.-C.E.
10
A4
0.9 BDL3245E/BDL4245E/BDL4645E
32”/42”/46” FHD LCD PUBLIC DISPLAY
2011-07-01 PHILIPS Page 34 of 38
MMD Confidential
Sa = Safety
E = Electromagnetic Compatibility
O = Other which including recycling, energy saving, ergonomics ,GreenMark
X=X-Ray
Remark:
1. Supplier to provide all approbation documents, samples before CR
2. Supplier to pay approbation samples and transportation cost.
3. Supplier to pay Switzerland approbation cost and provide EN62311 report.
4. AC/DC adaptor have to meet California Energy Commission requirement
5. Supplier have to check regulation information on rating label, carton label, user manual to
meet all mandatory regulation
6. Supplier have to apply all mandatory regulation base on sales country.
9.2 EMC
Requirements
Supplier DVT EMI test result must be submitted prior to
DVT samples delivery, and PVT EMI
test result must be
submitted again prior to PVT samples delivery. Which also has to meet
Philips' immunity testing specification.
9.3 RoHS
Restriction on the use of certain hazardous substances.
Lead, Cadmium, Mercury, Hexavalent Chromium, Polybrominated Bipheny1 (PBB) and
Polybrominated Bipheny1 Ether (PBDE)(flame retardant).
9.4 WEEE
Producer (Philips) responsible for retailer take back schemes and recycling.
-- System implemented.
-- Collection and recycle targets.
9.5 Ongoing
Regulatory
There's a possibility that other regulatory certificates will be required during the life of the
product. It is the responsibility of the supplier to provide related documentation.
10. DQE Test Items Template
Product Release Test: DQE/DQA:
The objective of Design Quality Assurance process is to define the activities to be taken by
concerning within the Product Creation Process to manage the quality and reliability of products
in a more coherent and systematic approach.
The scope of Design Quality Assurance process covers all activities to ensure the design quality
and reliability in Product Creation Process that starts from RFQ, Kick-off, EVT, DVT and PVT,
Product release phase & Pilot run and CR & MP phase.
Design Quality Assurance procedure covers the system flow charts and the activities described
as below.
Содержание BDL4245E/00
Страница 35: ...35 5 Block Diagram 5 1 Scaler Board ...
Страница 78: ...78 78 3 Remove all the screws as follow ...
Страница 79: ...79 4 Remove the main frame from the panel ...
Страница 83: ...83 3 Remove all the screws as follow ...
Страница 84: ...84 84 4 Remove the main frame from the panel ...
Страница 89: ...89 3 Set the parameters as below figure ...
Страница 91: ...91 6 Click Commands batch to load the file isp_psi_ext txt ...
Страница 95: ...95 ...
Страница 97: ...97 ...
Страница 100: ...100 100 5 Click Auto to upgrade 6 Update processing ...
Страница 101: ...101 7 Upgrade successfully 6 Troubleshooting Not connected error The way to cure it by select correct ISP Target ...
Страница 104: ...104 104 2 Tick the Analog DVI and click Loadfile to set the parameters 3 Select the EDID folder ...
Страница 137: ...137 ...
Страница 138: ...138 138 15 Monitor Exploded View ...
Страница 139: ...139 ...
Страница 140: ...140 140 ...
Страница 144: ...144 144 17 General Product Specification Please refer to the Product Specification the next page ...