16
Step 7: Connect the PE wire with Shield
Use the same method to make the remaining wire as the PE wire. Then crimp the PE wire into the
Ring Terminal along with the drainage line. Refer to the following table to select the appropriate
terminal:
AxN Size5
Ring
Terminals
d2(mm) W(mm)
F(mm)
E(mm)
D(mm)
d1(mm)
AxN 90.150.4
RNYBS22-6
6.4
12.2
15.1
24
13
7.7
AxN 110.200.4
RNYBS22-6
6.4
12.2
15.1
24
13
7.7
Step 8: Check and Mark
Check every wire and the connection between shield and PE wire, then label each wire.
Содержание AxN series
Страница 2: ......
Страница 7: ...5 1 3 Overall Dimensions...
Страница 21: ...19 area contact against the cable support so that they can together be grounded through drive housing...
Страница 32: ...30...
Страница 37: ...35 When the drive is ready N O connects Com and N C disconnects Com illustrated as below...
Страница 50: ...48 Connection diagram Note Only the first and the last CAN node device should use a 120 terminal resistor...