Circuit
layout
Legal Notes
PGO BR-500 ENGINE
Circuitlayout
1
INSTRUMENT UNIT
2
FUSE 7.5A
3
CONTROLLER
Theinjection indicator light is controlled upon every switching to "ON" bythe 3-second timing generated by the digital
instrument. This step is normallyinterrupted by the injection controller control. The timing lasts 5 seconds.
The diagnostic tester dwg. 020460Y is notprogrammed to check this circuit.
Proceed as follows:
TERMINAL
CONDITIONS
STANDARD
VALUES
15 - 23
- switch set to "ON"
- side stand raised
- switch to "RUN"
during the check
O V
after the check
battery voltage
P.9-34
Injection indicator circuit
Содержание BR-500
Страница 1: ......
Страница 2: ...INDEX OF TOPICS TIME CHART 12 ...
Страница 13: ......
Страница 14: ...INDEX OF TOPICS PRIOR TO DELIVERY 11 ...
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 33: ...PGO BR 500 ENGINE P 10 14 Automatic Transmission ...
Страница 59: ...PGO BR 500 ENGINE P 10 40 Flywheel Cover ...
Страница 61: ... Check that the blow by circuit reed closes properly PGO BR 500 ENGINE P 10 42 Flywheel Cover ...
Страница 65: ...PGO BR 500 ENGINE P 10 46 Flywheel Cover ...
Страница 67: ...PGO BR 500 ENGINE P 10 48 Flywheel Cover ...
Страница 240: ...INDEX OF TOPICS BRAKING SYSTEM 8 ...
Страница 245: ...INDEX OF TOPICS STEERING WHEEL AND SUSPENSIONS 7 ...
Страница 250: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 253: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 257: ...Transmission Gear box explosive diagram P 6 5 ...
Страница 258: ...P 6 6 ...
Страница 259: ...INDEX OF TOPICS ELECTRIC SYSTEM 5 ...
Страница 272: ...PGO BR 500 ENGINE P 5 14 ...
Страница 273: ...INDEX OF TOPICS COOLING SYSTEM 4 ...
Страница 281: ...INDEX OF TOPICS MAINTENANCE 3 ...
Страница 303: ...INDEX OF TOPICS OPERATION 2 ...
Страница 318: ...INDEX OF TOPICS CHARACTERISTICS 1 ...