3.Testing the recharging performance
a. Disconnect the couple of “fuse cable” .
b. Connect currency meter between red cable and battery, connect the positive cable(+)
to the main wire- harness, and the negative cable(-) of the recharge to the positive
cable(+) of the battery.
c. Set the head lamp switch at “OFF”, engine revolution is at 2000 rpm while testing.
Then increase the rpm slowly. (Assume the battery is fully charged. situation)
Head Lamp Switch
1,500rpm
3,000prm
OFF(DAY)
0.8A(MIN)
1.0A(MIN)
ON(NIGHT)
0.4A(MIN)
0.7A(MIN)
d. System layout:
While testing, the red wire cable must not touch the frame.
This test needs to be done when the battery is fully recharged.
This test needs to be done after engine is warm- up.
Fuse cable
coupler
regulator
To generator
P.5-10
PGO BR-500 ENGINE
Содержание BR-500
Страница 1: ......
Страница 2: ...INDEX OF TOPICS TIME CHART 12 ...
Страница 13: ......
Страница 14: ...INDEX OF TOPICS PRIOR TO DELIVERY 11 ...
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 33: ...PGO BR 500 ENGINE P 10 14 Automatic Transmission ...
Страница 59: ...PGO BR 500 ENGINE P 10 40 Flywheel Cover ...
Страница 61: ... Check that the blow by circuit reed closes properly PGO BR 500 ENGINE P 10 42 Flywheel Cover ...
Страница 65: ...PGO BR 500 ENGINE P 10 46 Flywheel Cover ...
Страница 67: ...PGO BR 500 ENGINE P 10 48 Flywheel Cover ...
Страница 240: ...INDEX OF TOPICS BRAKING SYSTEM 8 ...
Страница 245: ...INDEX OF TOPICS STEERING WHEEL AND SUSPENSIONS 7 ...
Страница 250: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 253: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 257: ...Transmission Gear box explosive diagram P 6 5 ...
Страница 258: ...P 6 6 ...
Страница 259: ...INDEX OF TOPICS ELECTRIC SYSTEM 5 ...
Страница 272: ...PGO BR 500 ENGINE P 5 14 ...
Страница 273: ...INDEX OF TOPICS COOLING SYSTEM 4 ...
Страница 281: ...INDEX OF TOPICS MAINTENANCE 3 ...
Страница 303: ...INDEX OF TOPICS OPERATION 2 ...
Страница 318: ...INDEX OF TOPICS CHARACTERISTICS 1 ...