insertion side.
- Lubricate the O-rings and
repeat the operations in the
reverse order for re-assembly.
(
3
) Fuel pump
- Note the position of the power
supply wires on the support
pos 1 = positive (red)
pos 4 = negative (black)
NOTE: the pump
connections are not
interchangeable.
-
Disconnect the power supply
cables
- Cut the delivery pipe fixing
band on the support.
- Remove the pump fixing
washer
PGO BR-500 ENGINE
P.9-54
Fuel feeding system
Содержание BR-500
Страница 1: ......
Страница 2: ...INDEX OF TOPICS TIME CHART 12 ...
Страница 13: ......
Страница 14: ...INDEX OF TOPICS PRIOR TO DELIVERY 11 ...
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 33: ...PGO BR 500 ENGINE P 10 14 Automatic Transmission ...
Страница 59: ...PGO BR 500 ENGINE P 10 40 Flywheel Cover ...
Страница 61: ... Check that the blow by circuit reed closes properly PGO BR 500 ENGINE P 10 42 Flywheel Cover ...
Страница 65: ...PGO BR 500 ENGINE P 10 46 Flywheel Cover ...
Страница 67: ...PGO BR 500 ENGINE P 10 48 Flywheel Cover ...
Страница 240: ...INDEX OF TOPICS BRAKING SYSTEM 8 ...
Страница 245: ...INDEX OF TOPICS STEERING WHEEL AND SUSPENSIONS 7 ...
Страница 250: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 253: ...INDEX OF TOPICS VEHICLE ENGINE 6 ...
Страница 257: ...Transmission Gear box explosive diagram P 6 5 ...
Страница 258: ...P 6 6 ...
Страница 259: ...INDEX OF TOPICS ELECTRIC SYSTEM 5 ...
Страница 272: ...PGO BR 500 ENGINE P 5 14 ...
Страница 273: ...INDEX OF TOPICS COOLING SYSTEM 4 ...
Страница 281: ...INDEX OF TOPICS MAINTENANCE 3 ...
Страница 303: ...INDEX OF TOPICS OPERATION 2 ...
Страница 318: ...INDEX OF TOPICS CHARACTERISTICS 1 ...