Table of contents
1
1.1
1.1.1 Applicable documents
1.1.2 Variants
1.2
1.3
1.3.1 Instructions in the text
1.3.2 Pictographs
1.3.3 Stickers on the product
1.3.4 Abbreviations
1.4
2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.7.1 Ensuring personnel qualification
2.7.2 Personnel qualification for maintenance and repair
2.7.3 Advanced training with Pfeiffer Vacuum
3
3.1
3.1.1 Cooling
3.1.2 Rotor bearing
3.1.3 Drive
3.2
3.2.1 Product types
3.2.2 Product features
3.3
4
4.1
4.2
5
5.1
5.2
Connecting the high vacuum side
5.2.1 Requirements for the dimensioning of a counter flange
5.2.2 Consider earthquake protection
5.2.3 Using a splinter shield or protective screen
5.2.4 Using the vibration compensator
5.2.5 Mounting orientations
5.2.6 Installation of ISO-KF flange
5.2.7 Attaching ISO-K flange onto ISO-K
5.2.8 Installation of ISO-K flange onto ISO-F
5.2.9 Attaching CF flange to CF-F
5.3
5.4
5.5
Connecting the electrical supply
5.5.1 Ground turbopump
5.5.2 Establishing electric connection
6
Table of contents
3/58
Содержание HIPACE 80 NEO
Страница 1: ...OPERATING INSTRUCTIONS EN Translation of the Original HIPACE 80 NEO Turbopump...
Страница 57: ...57 58...
Страница 58: ...PT0660 ed A Date 2109 P N PT0660BEN...