2
Page
Introduction / Features of the PM1030...... ..............................................................3
Installation Procedure..........................................................................................
.....
4
Connecting the DI300 / Connecting the Alarm Panel...........................................5-6
Programming the Alarm panel / Battery Charging....................................................6
Input and Output / Defaulting the Permaconn PM1030
.................................7
DI300 Powered by Panel – PM1030 Powered Independent Supply...............
7
PM1030 V2 and DI300 Powered by Panel / Transmission Delay Times........
8
LED Status Indicators PM1030.....................................................................
9
LED Status Indicators DI300
..............................................................................10
Final Commissioning Check List...................................................................11
PM1030 Contact ID Event table
.........................................................................12
Specifications PM1030 V2
.........................
.................................................................13
Standards Compliance / Liability / Warning............................................................14
Notes......................................................................................................................15
Table of Contents
RDCCO_2143_E
PM1030 Manual March 2019 v 2.2