perma PRO
- 18 -
7.
Replacement of the PRO LC unit
The Following Must Always Be Taken into Account
If the replacement of an empty PRO LC unit becomes necessary, it will be indicated by a simultaneous blinking of
the red and the green LED. Additionally, the display indicates that the PRO LC unit is empty (refer to figure 17).
figure 17
If you replace the PRO LC unit, you also have to change the battery set. Otherwise, the correct operation
of the lubricator cannot be guaranteed!
If you replace the PRO LC unit by a PRO LC unit of a different size, a corresponding protection cover
(refer to ”Accessories and Spare Parts”) must be used.
Since the drive unit and the control board must be protected against moisture, an exchange may only be
carried out in dry conditions!
After the installation of the new PRO LC unit, the control system continues to operate using the previously valid
setting of the discharge period.
7.1
Setting the Volume of the PRO LC unit
The size of the PRO LC unit must be set in the configuration menu with the two buttons on the drive unit (see
figure 18). Please also refer to the operating chart (chart 5, chapter 6.8).
ATTENTION!
If the displayed setting does not correspond with the attached PRO LC unit size it will result in incorrect
discharge amounts and wrong signals in the display (Display, LEDs).
or
figure 18
ATTENTION!
Whenever a PRO LC unit is removed from the lubricator and is replaced by another LC unit, the control system
assumes that a new, completely filled PRO LC unit was attached.
Therefore NEVER attach a PRO LC unit that is not completely full!
%Vol.
LC 500
Config.
LC250
Config.
LC 500
Содержание Distributor PRO MP-6
Страница 3: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Страница 4: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...
Страница 77: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Страница 78: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...