80 . Frontier IR Dual-Range Systems User's Guide
Opening the Main Cover
To perform most maintenance tasks, you have to open the main cover of the spectrometer.
WARNING
Switch off the mains power supply to the spectrometer, wait 60 seconds
and disconnect the power cable before you open the cover of the
spectrometer. This makes sure that you are safe from electrical shock
and laser radiation.
CAUTION
Do not open the main cover if the humidity is >80% relative humidity for
an instrument fitted with KBr optics.
The humidity sensitive optics will be damaged if subjected to a relative
humidity in excess of the specified level.
The main cover is hinged at the back of the instrument and opens from the front. Figure 41
identifies the locking bolts, which are on the front of the instrument.
Figure 41 Main cover locking bolts
1.
Switch off the power supply to the spectrometer.
2.
Wait for 60 seconds.
3.
Disconnect the power cable.
Locking bolt
Locking bolt
Содержание Frontier IR
Страница 1: ...FRONTIER IR DUAL RANGE SYSTEMS User s Guide MOLECULAR SPECTROSCOPY...
Страница 5: ...Introduction...
Страница 10: ...10 Frontier IR Dual Range Systems User s Guide...
Страница 11: ...Warnings and Safety Information...
Страница 23: ...An Overview of the Frontier IR Dual Range Spectrometers...
Страница 34: ...34 Frontier IR Dual Range Systems User s Guide...
Страница 35: ...Unpacking and Installation...
Страница 45: ...Using the Spectrometer with Spectrum...
Страница 52: ...52 Frontier IR Dual Range Systems User s Guide Figure 21 Atmospheric suppression...
Страница 57: ...Routine Maintenance...
Страница 78: ...78 Frontier IR Dual Range Systems User s Guide...
Страница 79: ...Advanced Maintenance...
Страница 94: ...94 Frontier IR Dual Range Systems User s Guide...
Страница 95: ...Appendices...