Routine Maintenance . 71
1.
The tubing is connected to the instrument by a universal pipe fitting which is secured to
the tubing with a nut. Two sets of fittings are supplied with the instrument. Assemble
the fittings to the tubing as illustrated in Figure 35.
Figure 35 Purge fittings
2.
Tighten the nut, ensuring it is not over tightened.
3.
Push the connector on the end of the tubing into the purge connector of the
compartment to be purged (Figure 36).
If the connector will not push in, press the clip at the bottom of the port and try again.
Figure 36 Connector fitted to purge port
4.
Connect the free end of the tubing to the gas regulator.
NOTE: Ensure the regulator is set to a pressure not greater than 6.9 kPa (1 lbf/in
2
).
5.
Open the gas flow valve on the regulator until a flow rate of 28 l/minute (1 ft
3
/minute)
is achieved.
The instrument compartment is purged in 10 minutes. The sample compartment is
purged in 2 minutes.
6.
Once purging is complete turn off the gas supply.
Instrument purge
Sample purge
Beveled end
of connector
Knurled nut
Tubing
Содержание Frontier IR
Страница 1: ...FRONTIER IR DUAL RANGE SYSTEMS User s Guide MOLECULAR SPECTROSCOPY...
Страница 5: ...Introduction...
Страница 10: ...10 Frontier IR Dual Range Systems User s Guide...
Страница 11: ...Warnings and Safety Information...
Страница 23: ...An Overview of the Frontier IR Dual Range Spectrometers...
Страница 34: ...34 Frontier IR Dual Range Systems User s Guide...
Страница 35: ...Unpacking and Installation...
Страница 45: ...Using the Spectrometer with Spectrum...
Страница 52: ...52 Frontier IR Dual Range Systems User s Guide Figure 21 Atmospheric suppression...
Страница 57: ...Routine Maintenance...
Страница 78: ...78 Frontier IR Dual Range Systems User s Guide...
Страница 79: ...Advanced Maintenance...
Страница 94: ...94 Frontier IR Dual Range Systems User s Guide...
Страница 95: ...Appendices...