34
C1 Connecting to the Systems
SB-2
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
General
– The support (connection) of the
panels must always occur at the
position where the tie rod is in-
stalled for normal use (double-sid-
ed). Failure to do so results in the
static system of the formwork unit
being changed which could lead to
large deformations; even breakage
in extreme cases! Formwork unit
is to be statically checked!
– When extending the formwork,
take into account the information
provided by PERI for the respec-
tive system!
– After concreting or moving each
time, the mountings/wedges are
to be checked and, if necessary,
permanently secured.
Girder formwork
VARIO GT 24, RUNDFLEX
– Assembly is to take place horizontally
and with the crane.
– Place the formwork unit on a tidy, flat
and sufficiently load-bearing surface.
Place timbers underneath.
– Depending on the top edge of the
Brace Frame, the concreting platform
can only be assembled using individu-
al brackets and guardrail posts along
with decking and handrail boards sup-
plied by the contractor.
– Take into account the permissible
width of influence; see PERI Design
Information Brace Frame SB.
max.
6
.0
0
m
VARIO GT
Содержание SB Brace Frame
Страница 2: ......
Страница 6: ......
Страница 29: ...25 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 59: ...55 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 82: ......
Страница 83: ......