E1 Shuttering
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
– Always attach transportable units
to the Brace Frame when trans-
porting.
– Always use the available
load-bearing points as well as tex-
tile straps!
– Take into account the permissible
load-bearing capacities!
– Before moving each time, always
check the mountings/wedges. If
necessary, secure wedges with
cotter pins or screws.
Procedure
1. Attach transportable unit to the crane.
(Fig.
E1.01)
2. Erect, in the process make sure that
the bottom formlining edge is not
damaged.
3. Place the transportable unit on a suf-
ficiently load-bearing surface, and
align using the spindles (20.6, 20.7).
4. Ensure stability and release crane
lifting gear.
5. Position additional transportable
units.
6. Install element connections between
the transportable units: see Instruc-
tions for Assembly and Use of the
system, e.g. VARIO GT 24 Coupling
VKZ 99.
7. Fix Brace Frames to the ground using
re-usable anchor parts on the anchor
components, see A2.
(Fig.
E1.02)
Are the element connections and an-
chor components securely installed?
Fig. E1.01
Fig. E1.02
Содержание SB Brace Frame
Страница 2: ......
Страница 6: ......
Страница 29: ...25 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 59: ...55 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 82: ......
Страница 83: ......