35
35
40
40
35
C1 Connecting to the Systems
SB-2
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
VARIO GT
Fig. C1.04a
Fig. C1.05a
Fig. C1.04b
Fig. C1.05b
Connecting to VARIO GT 24
Max. concreting height h = 6.00 m.
Connecting to RUNDFLEX
Max. concreting height h = 5.40 m.
Take into account the respective sys-
tem Instructions for Assembly and
Use.
Required components per waler sec-
tion:
35
Hook Strap SB-2, asymmetrical
1x
Alternative
Hook Strap SB-1, 2.
Connecting with Hook Strap SB-2
1. Place Brace Frame in position with
the crane and set down on steel
waler/Distribution Waler.
2. Release one bolt, SW 19, on the
Hook Strap and push bolt through the
hole on the Brace Frame. Screw in
bolt.
3. Mount hook on the steel waler/Distri-
bution Waler and tighten.
4. Fix Hook Straps to all steel walers/
Distribution Walers.
(Fig. C1.04a, C1.05a at top, C1.04b,
C1.05b at bottom)
5. Release crane lifting gear.
6. Mount second Brace Frame.
7. Brace the Brace Frames with scaffold
tubes (40) (horizontal and vertical).
8. Mount concreting platforms.
9. Adjust height of the transportable
unit with the spindles.
Erection
Erect, move, align and anchor transport-
able unit with textile straps and crane,
see C2.
RUNDFLEX
Содержание SB Brace Frame
Страница 2: ......
Страница 6: ......
Страница 29: ...25 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 59: ...55 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 82: ......
Страница 83: ......