29
S
42.1
42
B4 Moving
SB Brace Frame for single-sided walls
Instructions for Assembly and Use – Standard Configuration
With Guide Roller SB-A, B
Required components:
42
Guide Roller SB-A, B
2x
Ensure stability!
Preparation
– Determine the centre of gravity of the
dead weight (formwork and Brace
Frame).
– Determine the overall centre of gravi-
ty S
– For determining the stability, the wind
load is unfavourably set.
– Take the ballast into consideration.
(Fig. B4.05)
– Include Guide Rollers in the planning
so that the overall centre of gravity
lies between the rollers. (Fig. B4.04)
Assembly
1. Push back the wedge (42.1).
2. Push the Guide Roller (42) over the
profile tube and secure with a wedge.
(Fig. B4.03a + B4.03b)
Concreting
For concreting, the Guide Roller is to be
spindled free of load. Load transfer
takes place via the spindles on the
Brace Frame.
Moving
Move unit slowly and without the help
of any power-operated pulling means.
Fig. B4.03
Fig. B4.04
Fig. B4.03a
Fig. B4.03b
Fig. B1.05
Содержание SB Brace Frame
Страница 2: ......
Страница 6: ......
Страница 29: ...25 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 59: ...55 SB Brace Frame for single sided walls Instructions for Assembly and Use Standard Configuration ...
Страница 82: ......
Страница 83: ......