27
.9.20
13
30
AS-i 3.0 PROFINET Gateway with integr. Safety Monitor
Installation
7.3
Installing in the control cabinet
The AS-I/Gateway is installed in the control cabinet on 35mm DIN rails per DIN
EN 50 022.
To install, place the unit on the upper edge of the DIN rail and then snap in the
lower edge.
7.4
Removing
To remove, press the holding clamps [2] down using a screwdriver [1], press the
unit firmly against the upper rail guide and lift out.
Information!
The enclosure of the
AS-I/Gateway
is made of stainless steel. The unit is also sui-
table for exposed wall mounting.
+
-
+
-
+
-
[1]
[2]
+
-
+
-
+
-
1
2
3
Содержание VBG-PN-K30-D-S16
Страница 1: ...AS I 3 0 PROFINET GATEWAY WITH INTEGR SAFETY MONITOR FACTORY AUTOMATION MANUAL...
Страница 41: ...AS i 3 0 PROFINET Gateway with integr Safety Monitor Installation 27 9 2013 41 1 new old 2 3...
Страница 125: ...AS i 3 0 PROFINET Gateway with integr Safety Monitor Appendix Examples 27 9 2013 125...
Страница 126: ...27 9 2013 126 AS i 3 0 PROFINET Gateway with integr Safety Monitor Appendix Examples...
Страница 130: ......