background image

Installer manual Fleck 5800 XTR - Spare parts and options

Ref. MKT-IM-006 / E - 12.11.2019 

123 / 126

11.8

Meters parts list

Item

Part number

Description

Packaging

quantity

1

60626-01

Meter turbine assembly ¾" SXT

1

2

BR19791-01

Meter cable turbine assembly

1

3

19797

Meter turbine assembly 5800

1

4

19569SP

Clip

12

5

13314SP

Screw

50

Item

Part number

Description

Packaging

quantity

1

13305-01SP

O-ring 560 CD Adapt Coupling

10

2

13255SP

Mounting clip

12

3

13874

Cap, meter, electronic

1

Содержание Fleck 5800 XTR

Страница 1: ...FLECK 5800 XTR INSTALLER MANUAL WATER PURIFICATION...

Страница 2: ...on 12 2 3 Hazards 12 2 3 1 Personnel 12 2 3 2 Material 13 2 4 Hygiene and sanitization 13 2 4 1 Sanitary issues 13 2 4 2 Hygiene measures 13 3 Description 14 3 1 Technical specifications 14 3 2 Perfor...

Страница 3: ...environement 38 5 3 1 General 38 5 3 2 Water 39 5 3 3 Electrical 39 5 3 4 Mechanical 40 5 4 Integration constraints 40 5 5 Valve connection to piping 41 5 5 1 Top mounted valve installation 41 5 6 Bl...

Страница 4: ...ter filling draining and waterproofness inspection 87 7 2 Sanitization 88 7 2 1 Disinfection of water softeners 88 7 2 2 Sodium or calcium hypochlorite 88 7 2 3 Electro chlorination 89 8 Operation 90...

Страница 5: ...ning 106 9 4 9 Optical sensor replacement 107 9 4 10 Encoding wheel cleaning 108 9 4 11 Valve on tank assembly 109 10 Troubleshooting 110 10 1 Error detection 112 10 2 Error alerts 112 11 Spare parts...

Страница 6: ...system installation situation The person installing this equipment should have training in the Fleck series XTR controllers and water softener installation knowledge of water conditioning and how to d...

Страница 7: ...Valve DF Down Flow DLFC Drain Line Flow Controller Inj Injector QC Quick Connect Regen Regeneration S S Seals Spacers SBV Safety Brine Valve TC Time Clock UF Up Flow 1 6 Norms 1 6 1 Applicable norms C...

Страница 8: ...at this list is not an exhaustive list of all our certifications In case of need for more information please contact us 1 7 Procedure for technical support Procedure to follow for any technical suppor...

Страница 9: ...assembly of systems or products with this product and vice versa use of a non compatible lubricant grease or chemicals of any type and not listed by the manufacturer as compatible for the product fail...

Страница 10: ...nstantaneously access to all updated information related to the product such as valve s and tanks detailed configuration manuals spare parts lists troubleshooting recommendations multi lingual videos...

Страница 11: ...ord indicates a potentially hazardous situation that can result in serious or fatal injury if not avoided CAUTION This combination of symbol and keyword indicates a potentially hazardous situation tha...

Страница 12: ...any other legal regulations accident prevention and environmental protection measures as well as any recognized technical regulations relating to appropriate and risk free methods of working which ap...

Страница 13: ...manual regenerations in order to clean the media bed During such operations do not use the water for human consumption Perform a disinfection of the system in the case of installations for treatment o...

Страница 14: ...5 bar inlet valve only Continuous service flow p 1 bar 4 7 m3 h Peak service flow p 1 7 bar 6 1 m3 h Cv 5 4 gpm Kv 4 67 m3 h Maximum backwash flow p 1 8 bar 3 8 m3 h Cv Flow rate in gpm across the va...

Страница 15: ...n the limits of category II Pollution Degree 3 Temporary overvoltages must be limited in duration and in frequency Environmental conditions Indoor use only temperature from 0 C to 52 C maximum relativ...

Страница 16: ...alve itself at different flow rates It allows predetermining the maximum flow rate going through the valve depending on the system settings inlet pressure etc It also allows to determine the valve pre...

Страница 17: ...Installer manual Fleck 5800 XTR Description Ref MKT IM 006 E 12 11 2019 17 126 3 3 Outline drawing...

Страница 18: ...Fleck 5800 XTR Description 18 126 Ref MKT IM 006 E 12 11 2019 3 4 Components description and location Controller Touch screen Brine line Injector block Outlet Drain line Inlet Meter Mixing device Pis...

Страница 19: ...d Brine draw slow rinse cycles C2 The valve directs water through the brine injector and brine is drawn from the brine tank The brine is then directed down through the resin bed and up through the ris...

Страница 20: ...19 Outlet Inlet Inlet Outlet Drain Valve Valve SERVICE NORMAL USE C1 BACKWASH Outlet Inlet Inlet Outlet Drain Drain Valve Valve C2 BRINE DRAW SLOW RINSE C3 RAPID RINSE From brine tank Outlet Inlet Inl...

Страница 21: ...sodium ions and are sent to the drain The resin is regenerated during the brine cycle Then the slow rinse phase starts Backwash cycle C2 The flow of water is reversed by the valve and directed down t...

Страница 22: ...2019 Outlet Inlet Inlet Outlet Drain SERVICE NORMAL USE C1 BRINE DRAW SLOW RINSE Outlet Inlet Inlet Outlet Drain Drain C2 BACKWASH C3 RAPID RINSE Outlet Inlet Inlet Outlet C4 BRINE REFILL SERVICE NOR...

Страница 23: ...the valve comes back in to service position and stays as long as needed for brine saturation Brine draw slow rinse cycle C3 The valve directs water through the brine injector and brine is drawn from...

Страница 24: ...2 11 2019 Outlet Inlet Inlet Outlet Valve SERVICE NORMAL USE C1 BRINE REFIL Outlet Inlet Inlet Outlet Drain C2 SERVICE C3 BRINE DRAW SLOW RINSE Outlet Inlet Inlet Outlet C4 BACKWASH C5 RAPID RINSE To...

Страница 25: ...the media Backwash cycle C1 The flow of water is reversed by the valve and directed down through the riser tube and up through the filter media During the backwash cycle the filter bed is expanded an...

Страница 26: ...Fleck 5800 XTR Description 26 126 Ref MKT IM 006 E 12 11 2019 Outlet Inlet Inlet Outlet Drain SERVICE NORMAL USE C1 BACKWASH Outlet Inlet Inlet Outlet Drain C2 RAPID RINSE SERVICE NORMAL USE Valve Va...

Страница 27: ...DF piston kit part number BR61837 The injector is in the upper hole and the plug in the lower hole 3 6 2 Upflow The valve is mounted with the UF piston kit part number BR61838 The injector is in the...

Страница 28: ...evice The valve can be equipped with a mixing device 1 whose function is to regulate the hardness of the water at the outlet The mixing can be set from 0 to 50 of hard water i e 0 turn 0 of hard water...

Страница 29: ...2 1 Parameters to be considered Whenever installing a softener it is preferable to have full water analysis to ensure the inlet water content will not affect the resin bed Tip Please consult your res...

Страница 30: ...r and temperature 16 C is Piping size internal diameter Max flow rate in mm m3 h at 3 m s 0 5 12 1 22 0 75 20 3 39 1 25 5 73 1 25 32 8 69 1 5 40 13 57 2 0 50 21 20 2 5 63 34 2 3 0 75 49 2 4 2 2 Determ...

Страница 31: ...ty of the unit can be expressed in different ways the mass capacity which corresponds to the weight in equivalent CaCO3 that can be fixed on the resin expressed in kg as CaCO3 the volume capacity whic...

Страница 32: ...esin L Ccor resin ex corresponding resin exchange capacity f m3 l or dH m3 l To calculate the system volume capacity Vcapacity Mcapacity THinlet Or Vcapacity Ccapacity THinlet with Vcapacity system vo...

Страница 33: ...rough the injector nozzle to create the suction effect QInj 4 x BV h with Qinj total flow rate passing through the injector L h BV bed volume of resin L Info This value does not correspond to the brin...

Страница 34: ...ne draw brine draw duration min Vbrine brine volume to be drawn L see Refill calculation Page 35 Qdraw injection draw flow rate L min Tip Multiply the amount of salt in kg by 3 to get a approximation...

Страница 35: ...rolled by the refill controller BLFC The relation between the BLFC size the tank size and the resin volume is given in the valve specifications To calculate the refill duration Trefill VWB QBLFC with...

Страница 36: ...6 126 Ref MKT IM 006 E 12 11 2019 4 4 1 1650 injectors INJECTOR 000 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 00 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 0 Total...

Страница 37: ...tem sizing Ref MKT IM 006 E 12 11 2019 37 126 INJECTOR 1 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 2 Total Rinse Draw Flow rate l min Inlet pressure bar INJECTOR 3 Total Rinse Draw...

Страница 38: ...he device please ensure to have disconnected the transformer from the power source to shut off inlet water supply to the valve and to drain water pressure opening a tap down line of the valve 1 Be car...

Страница 39: ...namic pressure on injector of water pressure is required for the regeneration valve to operate effectively Mandatory Do not exceed a maximum of 8 6 bar inlet pressure In such cases it is necessary to...

Страница 40: ...st fitting the valve the drain line must be a minimum of 12 7 mm in diameter Use 19 mm pipe if the backwash flow rate is greater than 26 5 lpm or the pipe length is greater than 6 m do not support the...

Страница 41: ...ng fixed to a rigid structure e g frame skid wall so that the weight of it is not applying any stress on the valve and tank Support to the wall min 200 mm flexible The diagrams above illustrate how th...

Страница 42: ...may void the warranty of Pentair products in the same way using lubricant Page 42 on the valve thread is not allowed and will void the warranty for the valve and tank Indeed using lubricant there wil...

Страница 43: ...le Can be integrated in the valve Pressure gauge Valve Resin tank Filter cartridge 19791 01 21675 Main inlet Pressure regulator Suggested options Check valve to prevent water harm By pass Meter Mixing...

Страница 44: ...system at the selected regeneration time after the calculated system capacity is depleted The control calculates the system capacity by dividing the unit capacity by the feed water hardness and subtra...

Страница 45: ...Installer manual Fleck 5800 XTR Installation Ref MKT IM 006 E 12 11 2019 45 126 5 8 Electrical connections Motor 12 VDC Relay auxiliary 1 USB Remote lock and start Meter Relay auxiliary 2 12 VDC...

Страница 46: ...ge due to bad mounting Do not solder pipes with lead based solder Do not use tools to tighten plastic fittings Over time stress may break the connections Do not use petroleum grease on gaskets when co...

Страница 47: ...run does not exceed 4 6 m and water pressure at the softener is not less than 2 76 bar Elevation can increase by 61 cm for each additional 0 69 bar of water pressure at the drain connector Where the d...

Страница 48: ...n the side of the tank Insert the overflow fitting into the tank and tighten with plastic thumb nut and gasket as shown below Attach a 12 7 mm I D tubing not supplied to fitting and run to drain Do no...

Страница 49: ...hoses may shrink because of the vacuum during brine draw The brine line from the tank connects to the valve Make the connections and hand tighten Be sure that the brine line is secure and free from ai...

Страница 50: ...cle through the regeneration steps 2 Settings Displays the settings screen which allows you to adjust commonly used settings Pressing this button while in the settings screen provides access to the ma...

Страница 51: ...media and then slowly rinsed out 14 Pause Valve comes back in service position to allow brine preparation after refill Shown if variable refill brining regeneration flow has been selected in master s...

Страница 52: ...zer and peak flow buttons to reset totalizer and peak flow data and in master settings screen to reset parameters to factory or non factory settings 24 Non factory settings Press to save all the confi...

Страница 53: ...ve minutes Screen name Parameters Values Notes Format Format Language English French German Italian Spanish Dutch Portuguese Changes the language to display screen text and button labels Units U S Met...

Страница 54: ...99 days 4 8 12 16 and 20 hours Mandatory for timeclock systems Available to be programmed for all regeneration types 4 to 20 hours setting available only for the timeclock systems Time driven 12 24 h...

Страница 55: ...ws to adjust the system s displayed language English French German Italian Spanish Dutch or Portuguese Press the units button and use the arrows to adjust the system s units of measure either U S or m...

Страница 56: ...kly press the keypad button the number of times that correspond with the position of the correct letter on the button For example to enter the letter c quickly press the abc button three times Press t...

Страница 57: ...tem service optional The assistance interval can be based on a set number of months month based or a number of regenerations regen based Press the interval button and use the arrows to select a month...

Страница 58: ...and time Day and Time 17 jan 15 12 01 pm sat Day Month Hour Minute Year Day of week am pm hr Press the Hour Minute and am pm hr buttons and use the arrows to adjust the values to the correct time Set...

Страница 59: ...e master settings or home screens press the assistance button to access the user assistance screen Assistance Maintenance for service or assistance company name XXX XXX XXXX Info If no assistance name...

Страница 60: ...regeneration will automatically be run whether one is scheduled or not Press regen time and use the arrows to adjust the time of day when an automatic regeneration cycle will begin Press hardness and...

Страница 61: ...ng due to improper master settings adjusting Before entering master settings please contact your professional water dealer The following is a detailed overview of settings available in Master Settings...

Страница 62: ...ge 63 for more detailed information format Contains settings for Language Units Assistance Name Assistance Phone and Assistance Interval See Touchscreen controller quick start Page 53 for more informa...

Страница 63: ...not be shown depending on controller configuration The controller will discard any changes and exit master settings if any button is not pressed for five minutes Screen name Parameters Values Notes Fo...

Страница 64: ...4 single system is currently the only available selection Valve 5800 5810 5812 Select the type of valve to be installed Regen type Time clock Softener immediate Softener delayed Filter immediate Filt...

Страница 65: ...k systems Available to be programmed for all regeneration types 4 to 20 hours setting available only for the timeclock systems Regeneration time 12 24 hours clock Required for time clock and delayed r...

Страница 66: ...steps Variable refill calculates refill time based on salt dosage media volume and BLFC Size and it is not possible to change it Time per cycle step can be programmed for all other regenerant flow op...

Страница 67: ...not match any other selection Selecting the generic meter type requires setting the number of pulses per gallon or litre to ensure proper metering Generic 0 1 999 9 pulses per gallon 1 1500 pulses pe...

Страница 68: ...y available when cl generation low salt is set ON This parameter determines the regeneration frequency on which there will be chlorine generation Low salt detection will be performed during regenerati...

Страница 69: ...ou to connect a PC to the controller for field programming and diagnostic parameter download Info Field programmer software is required for field programming features See XTR field programmer manual f...

Страница 70: ...d filter metered immediate filter metered delayed tank sensors Info Depending of the regeneration type selected following parameters to be set will change Adjusting regeneration type may turn set rela...

Страница 71: ...the salt dosage blfc size Adjust the BLFC size Press to save and pass to the next screen or press to return to the master settings screen without saving Valve capacity hardness sensor sensitivity na 3...

Страница 72: ...aster settings screen or press to return to the master settings screen without saving 6 3 5 3 Softener metered delayed Valve media volume salt dosage blfc size 0 500 gpm 110 g L 30 L media volume Adju...

Страница 73: ...t the day override regen time Adjust the regeneration time reserve Contains settings for the type of reserves fixed fixed volume weekly and variable Press to save and return to the master settings scr...

Страница 74: ...rride time driven Adjust the day override regen time Adjust the regeneration time vol override volumetric Adjust the volume of water treated between regenerations Press to save and return to master se...

Страница 75: ...nse Info This option appears only if regeneration type is set to time clock or filter metered delayed or immediate custom upflow downflow filter Allows for up to 20 programmable cycle steps Info Custo...

Страница 76: ...w 6 3 6 1 Upflow downflow downflow 2x backwash filter variable refill brining Regeneration step n time n 10 m step name step n Step type pause backwash draw rapid rinse tank refill time n Adjust the s...

Страница 77: ...ps will be pause rapid rinse and backwash time n Adjust the step timing Press to save and pass to the next step or press to valid the last step and return to the master settings screen Pressing modify...

Страница 78: ...e step button for which the relay should turn on time based The relay will turn on and off at up to two specified start and end times volume based The relay will turn on when the valve has treated a s...

Страница 79: ...Turns the relay ON when the valve is on water treatment rapid rinse Turns the relay ON when the valve is on rapid rinse cycle backwash Turns the relay ON when the valve is on backwash cycle Press and...

Страница 80: ...ving If already in second relay or if second relay has not been activated press to save and to return to the master settings screen or press to return to the master settings screen without saving 6 3...

Страница 81: ...0 5 gpm or 1 Lpm is detected by the flow meter over a 8 hours period Press to save and to return to the master settings screen or press to return to the master settings screen without saving 6 3 9 Set...

Страница 82: ...m the secondary master settings screen press the remote regen button to display the remote regeneration screen Remote Regeneration remote signal duration off remote signal duration Contains settings f...

Страница 83: ...l 1 on cl generation low salt Contains settings for the chlorine generation Select between OFF low salt detect and ON regen interval Contains the setting for the chlorine generation interval Set up fr...

Страница 84: ...agnostics screen Diagnostics flow rate peak flow totalizer 153 L 9 2 Lpm 5 7 Lpm Press the screen navigation arrows at the upper right and left of the screen to view each diagnostic parameter Press th...

Страница 85: ...t day for the past six weeks Enter the parameter to display average water daily usage Select each day to display daily consumption for each day of the past six weeks together with dates Use the arrows...

Страница 86: ...ry button to reset all controller parameters to their factory defaults or press the non factory button to reset controller parameters to previously saved custom settings see Non factory setting Page 8...

Страница 87: ...check the level of water in the brine tank or cabinet The level of water in the brine tank should be about 5 cm above the salt platform You may want to mark the level on the brine tank as this can be...

Страница 88: ...ith polystyrene resins synthetic gel zeolite greensand and bentonites 5 25 Sodium hypochlorite If stronger solutions are used such as those sold for commercial laundries adjust the dosage accordingly...

Страница 89: ...Fleck 5800 XTR Commissioning Ref MKT IM 006 E 12 11 2019 89 126 7 2 3 Electro chlorination Valves or systems already equipped with an electrochlorinator device or system will be sanitized during the...

Страница 90: ...esumes normal operation The time remaining in regeneration will be displayed on the home screen in hours and minutes Pressing the button during a regeneration cycle immediately advances the valve to t...

Страница 91: ...to stop the time of day from flashing and reset time if needed If power fails while the unit is in regeneration the controller will save the current valve position before it shuts down When power is r...

Страница 92: ...to the controller is cleared This requires opening the contact closure to clear the lockout condition The recommended gauge wire is 20 with a maximum length of 500 feet See Electrical connections Pag...

Страница 93: ...tion of softener filter and associated ancillaries and check for any leaks ensure valve connection to piping is made with adequate flexibility as per manufacturer instruction 2 Inspection of electrica...

Страница 94: ...i e outlet shut off during regeneration and or brine line shut off valve s 4 Test and record Total Hardness of outlet water from softener vessel s 9 1 3 2 Valve used for filtration 1 Initiate manual...

Страница 95: ...ace in case of leakage Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of leakage Check for watertightness clean or replace in case of le...

Страница 96: ...water concentration in chlorine and its derivative Seals Spacer cartridge is equipped with O rings that ensure watertightness by compression therefore by unmounting remounting the same cartridge may c...

Страница 97: ...eck and Clean Check and Clean Check and Clean Check and Clean Replace Meter cable Check Check Check Check Check replace if necessary Valve watertightness Check Check Check Check Check Valve to piping...

Страница 98: ...Refer to maintenance sheet 9 3 2 Use original approved lubricants P80 Emulsion lubricant water base lubricant 9 3 3 Maintenance instructions Disinfect and clean the system at least once a year or if t...

Страница 99: ...126 9 4 2 Controller motor replacement 1 Remove the controller see Controller replacement Page 100 2 Disconnect the optical sensor 3 3 Disconnect the motor 4 Open the motor clips 1 and pull out the o...

Страница 100: ...4 3 Controller replacement 1 Press the cover clips 2 on each side and open the cover 1 2 Press the board clips 3 and release the controller 4 3 Disconnect the old controller 4 Connect the new control...

Страница 101: ...w 1 4 Separate the power head 3 from the valve body 4 5 Change the power head 3 6 Reverse above procedure steps to rebuild Mind the core marker and align the small holes of the gears for easy reassemb...

Страница 102: ...nge the piston 3 and the seals spacers cartridge 5 Mandatory Pentair recommends always to change piston and seals spacers simultaneously Info The larger spacer 6 is the lower part of the seals spacers...

Страница 103: ...Installer manual Fleck 5800 XTR Maintenance Ref MKT IM 006 E 12 11 2019 103 126...

Страница 104: ...the injector 4 Using the pusher 2 remove the injector 1 Caution material Risk of injector damage due to bad removing To avoid any damage on the injector use only the pusher to remove it 5 Remove the s...

Страница 105: ...the grid 4 4 Clean with a terry cloth or change the BLFC 3 and the seal 2 5 Clean the grid 4 6 Lubricate the seal 2 with approved lubricant only Caution material Risk of damage due to wrong lubricant...

Страница 106: ...the DLFC holder 3 3 Using a flat screwdriver remove the DLFC 2 from DLFC holder 3 4 Clean or change the DLFC 2 5 Reverse above procedure steps to rebuild Mandatory The washers 2 have to be installed...

Страница 107: ...ontroller see Controller replacement Page 100 2 Disconnect the wire from the motor to the optical sensor 4 3 Release the optical sensor support 1 by pushing it back and up as shown 4 Release the optic...

Страница 108: ...Maintenance 108 126 Ref MKT IM 006 E 12 11 2019 9 4 10 Encoding wheel cleaning 1 Remove the controller see Controller replacement Page 100 2 With a small brush clean the encoding wheel 1 3 Reverse ab...

Страница 109: ...t cross threaded 3 Rotate the valve 1 clockwise and freely without using force until it comes to a stop Info This stop position is considered point zero 4 Rotate the valve 1 clockwise from point zero...

Страница 110: ...full of salt at all times Clean it yearly Salt may be bridged If using a salt grid plate ensure refill water is over it Resin fouling Call dealer find out how to confirm it clean the resin and prevent...

Страница 111: ...form properly 1 4 bar minimum Controller not cycling Replace controller Softener fails to use salt Plugged restricted drain line Clean drain line and or flow control Injector is plugged Clean or repla...

Страница 112: ...r alert appears on the home screen if an error condition is detected Press the error alert button to view the error message Most error alerts are cleared at regeneration If the error persists followin...

Страница 113: ...t a new Service Interval time Memory Corruption Error Internal memory inconsistent or corrupted 1 Cycle power to XTR controller 2 Drain supercap and cycle power to XTR controller 3 If error continues...

Страница 114: ...Part number Description Packaging quantity 1 18261SP Screw hex washer head 10 24 x 0 81 10 2 BR61837 Piston and seal kit assembly downflow 5800 1 BR61838 Piston and seal kit assembly upflow 5800 1 3 6...

Страница 115: ...000 30 psi upflow 1 11 18262SP Screw hex washer head 10 24 x 1 10 12 18276 01 Injector assembly plug with o rings 1 13 BR61857 01 Valve body assembly 5800 Filter includes items 14 15 16 17 and 18 1 BR...

Страница 116: ...C 1 assembly 9 gpm 1 26147 10 DFLC 1 assembly 10 gpm 1 26147 12 DFLC 1 assembly 12 gpm 1 26147 15 DFLC 1 assembly 15 gpm 1 20 18312SP Retaining clip drain 10 Not shown 40947 01 Plug brine valve with o...

Страница 117: ...ical sensor 1 6 BR61836 Panel gear assembly 1 7 43715 Cover lower 1 8 BR61835 Motor assembly 1 11 3 Safety brine valves list 2300 2310 BV 44 Item Brine system Part number Description Packaging quantit...

Страница 118: ...9625SP Brine Valve 1650 plastic nut assy 10 5 19649 Flow disperser 1 6 PWG19652 01 Poppet assy SBV with o ring 1 7 18312SP Retainer drain 10 8 PWG19803 Safety brine valve arm assy 1 9 19645 Body safet...

Страница 119: ...em Part number Description Packaging quantity 1 BU26054 Bypass plastic 1 2 13314SP Screw slot ind hex 8 18 x 0 60 50 3 13255SP Clip mounting 12 4 13305 01SP O ring 10 5 18706 10 Yoke 1 BSP male plasti...

Страница 120: ...nual Fleck 5800 XTR Spare parts and options 120 126 Ref MKT IM 006 E 12 11 2019 11 5 2 1 BSP female stainless steel bypass Item Part number Description Packaging quantity 1 BU28502 Bypass Stainless St...

Страница 121: ...Bypass body 1 BSP stainless steel 1 10 11986 Cover bypass Bottom 1 11 Kit 256 Adapter assembly kit coupling with o rings 1 12 13305 01SP O ring 10 13 13255SP Clip mounting 12 14 13314SP Screw slot ind...

Страница 122: ...be 1 1 m 06 ACS 1 BU28507 Distributor tube 1 1m06 HW 1 12165 01 Distributor tube 1 1m78 HW 1 4 25360 Bottom distributor 1 high flow 1 27106 Bottom distributor 1 high flow HW 1 5 25797 Bottom distribut...

Страница 123: ...ription Packaging quantity 1 60626 01 Meter turbine assembly SXT 1 2 BR19791 01 Meter cable turbine assembly 1 3 19797 Meter turbine assembly 5800 1 4 19569SP Clip 12 5 13314SP Screw 50 Item Part numb...

Страница 124: ...19121 01 Meter Cable assembly STX Paddle 1 7 14716 01 Meter Cap assembly NT 1 8 13847SP O ring 137 Standard Meter 10 9 13509SP Impeller Meter 10 10 13314SP Screw 50 11 13821 Body Meter 5600 1 Not show...

Страница 125: ...country of installation The components included in the system must be separated and recycled in a waste recycling center that conforms with the legislation in force in the country of installation Thi...

Страница 126: ...www pentairaquaeurope com...

Отзывы: