INSTALLATION INSTRUCTIONS
66
6.11 Diagnostics
■
Error codes:
E01
Ionization Lock Out / Air Pressure Switch Tripped
E02
Safety Thermostat Tripped
E03
Flue Gas Thermofuse Tripped
H2O Low Water Pressure Alarm
E05
Heating Sensor Malfunction
E12
D.H.W Storage Cylinder Sensor Malfunction
E16
Electric Fan Malfunction
E22
Parameter Programming Request
E35
Flame Detection Malfunction
E42
Fan Speed P.C.B. Malfunction
■
Function codes :
Code
Function
Description
07
Flue test function active
(Chimney-Sweeper)
“High Fire” Test
Pressing the
“service” button for 7 seconds
activates the Flue test function. Pressing the
boiler off button deactivates the function.
The Flue test function operates the boiler at
the maximum heating pressure for
15 minutes without any modulation. The
function is useful for combustion testing.
08
Frost Protection
Central heating circuit
The function is activated when the heating
sensor senses a temperature of 41 °F. The
boiler operates at minimum gas pressure with
the 3-way diverter valve in the winter position.
The function is deactivated when the
temperature detected by the sensor reaches
86°F.
09
Frost Protection
D.H.W. circuit
The function is activated when the sensor
senses a temperature of 40°F. The water
heater operates at minimum gas pressure. The
3-way diverter valve closes in the summer
position and heats the D.H.W. circuit. The
function is deactivated when the D.H.W.
sensor detects a temperature of 46°F.
31
Incompatible Remote Control
Function active when the remote control
connected is not compatible with the printed
circuit board.
110V 60Hz
Содержание PCC 34-H
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERALInformation 6 ING ...
Страница 10: ...GENERALInformation 7 ...
Страница 11: ...GENERALInformation 8 ...
Страница 32: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Страница 33: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Boiler Is A PAHVK Horizontal Kit ...
Страница 37: ...INSTALLATION INSTRUCTIONS 34 ...
Страница 38: ...INSTALLATION INSTRUCTIONS 35 ...
Страница 67: ...INSTALLATION INSTRUCTIONS 64 INDIRECT FIRED WATER HEATER 6 9 D H W sensor connection ...
Страница 71: ...68 6 13 Cycle Sequence of Operations ...
Страница 72: ...69 Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...