INSTALLATION INSTRUCTIONS
26
Always check to make sure that the appliance has an efficient ground system. This requirement is only
satisfied if it has been properly connected to an efficient ground system installed in accordance with the
requirements of current safety standards and carried out by professionally qualified personnel.
This basic safety measure must be checked, verified and carried out by professionally qualified personnel.
Have the electrical system checked by a qualified electrician. The manufacturer will not be held liable for any
damage or injury caused as a result of an inefficient or faulty ground system.
■ Ensure the domestic power supply is checked by a qualified electrician to ensure that it can support the
maximum power absorption of the appliance, as indicated on the rating plate. In particular, make sure that the
cable sizes are adequate for the power absorbed by the appliance;
■ The power supply cable must be replaced by a qualified electrician. If the cable is damaged in any way, switch
off the appliance and have the cable replaced by a suitably qualified electrician;
When using an electrical appliance, a few fundamental rules must be observed:
Do not touch the appliance with damp or wet parts of the body or when barefoot.
Do not pull on the electric wires.
Do not allow the appliance to be used by children or anyone unfamiliar with its operation;
If the unit fails to re-start after any fault, unplug the unit for 30 seconds, then re-plug in the unit
and try to restart with the on/off switch. If the unit fails to restart, call a qualified Technician
for service.
Содержание PCC 34-H
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERALInformation 6 ING ...
Страница 10: ...GENERALInformation 7 ...
Страница 11: ...GENERALInformation 8 ...
Страница 32: ...INSTALLATION INSTRUCTIONS 29 Venting Pictures Illustrations ...
Страница 33: ...INSTALLATION INSTRUCTIONS 30 Included With Each Combination Boiler Is A PAHVK Horizontal Kit ...
Страница 37: ...INSTALLATION INSTRUCTIONS 34 ...
Страница 38: ...INSTALLATION INSTRUCTIONS 35 ...
Страница 67: ...INSTALLATION INSTRUCTIONS 64 INDIRECT FIRED WATER HEATER 6 9 D H W sensor connection ...
Страница 71: ...68 6 13 Cycle Sequence of Operations ...
Страница 72: ...69 Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...